Laserfiche WebLink
_ •s <br /> tt � <br /> it <br /> SIERRA <br /> STANDARD OPERA'T'ING PROCEDURE <br /> GROUND WA'T'ER SAMPLING <br /> The l0110%011i4 dtscrihes s:unplfttg procedures used by SITS tFrlrl prrsrsrulcl to rullcet alsd <br /> llandlc f+rotlnd water sampkc s, l3cf()re samples arc collected.c.lrellil consideration is gil•en to[lie <br /> type of i1lla1}'sls to Ile perfornit(I so that preca+stions art. lafcetl to prcvtnt loss of volatile <br /> cunlpunulls urconlanrinatloli of the sample,ane]Ul prcticn"c the;;Mlsple lair silbsc(plent ,ttlalysis. <br /> 1Vel1s will be sampled nn less hunt 24 hull's alley well dcvel(�psnc itt. C'ol1t�"ttun tuctlulcks spcclflc <br /> to ground water sant{Mini arc prestmrd lxiluu. <br /> Prior to salupling, earls well is Owcht•cl for the prescncr offrcc-phase hycirocarbons uslog <br /> all MMC llexl-dip imerlOce probe, Produc:l thtcicncss (tneaslll'ee! to the ucaresl 0.01 ill is noted <br /> on the sampling fol"n. water level lurasurcments arc also mill'usilsg either a Water level meter <br /> or the Interface probe. The Water level tncasurements arc also noted on the sampling brut. <br /> Prior la sutrlpltng, cacll 'c" IS purged of a]ltinillltnll of fok"-Well casing volifilies Of wafer <br /> ush11; a stealn•cicanc(1 PVC bailer. or a pre cic:nled pump. '!'cmperattlrc. {)11 and electrical <br /> conductivity are measured at least three limes during purglng. Purging is continued until these <br /> re, pH ur conductivity do not exceed±o.5'F, <br /> parameters have stabilized ti.e.,changes in temperatu <br /> {].1 or 51%, <br /> The purge Water is stored temporarily on-site in 55-gallon Department of Transportation- <br /> Approved drums pending analytic results. The cinlms are labeled with the date.contents.the SES <br /> field personnel Initials and SES phone number. <br /> Ground water samples are collected front the wells with steam-cleaner}Teflon bailers. The <br /> water samples are decanted Into the appropriate container for the analysis to be performed. Pre- <br /> preserved sample containers may be lased or the analytic laboratory may add preservative to the <br /> sample upon arrival, Duplicate samples are collected from each well as a back-up sample and/or <br /> to provide quality control. The samples are labeled to include the project number, sample 1D. <br /> date,preservative,and the field person's initials. Tile samples are placed in polyethylene bags and <br /> in an ice chest(maintained at 4'C with blue"ice or ice)for transport under chain-of-custody to the <br /> laboratory. <br />