My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:40:37 PM
Creation date
4/7/2020 1:26:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 June 2001 <br /> AGE-NC Project No. 98-0433 <br /> Page 6 of 8 <br /> Following completion of fifteen-inch soil boring, a 6-inch diameter recovery well Schedule 40 PVC <br /> 0.02-inch slotted well screen and casing will be installed. A 20-foot section of well screen will be <br /> installed from a depth of approximately 15 feet to 35 feet bsg,blank casing will extend from 15 feet <br /> bsg to the ground surface. The casing, filter pack and well sealing materials will be placed into the <br /> borehole through the interior of the hollow-stem augers. After installing the well casing, filter pack <br /> material consisting of pre-washed#3 Lonestar sand and pea gravel will be added from the bottom <br /> of the borehole to approximately two feet above the screened interval. <br /> Following placement of the filter packs, the well will be surged to assist in settling the filter pack. <br /> Additional sand will be added if filter pack settling occurs. A nominal 1-foot bentonite seal will be <br /> placed above the filter pack. The bentonite chips will be hydrated with five gallons of potable water. <br /> The bentonite chips will be allowed to hydrate for a minimum of one-half hour prior to grouting. <br /> The remaining annular spaces will be filled to the ground surface with a cement grout. The grout <br /> mixture will consist of Type UII portland neat cement and not more than 10 gallons of water per <br /> 94-pound sack of cement. The grout will be placed over the bentonite as an annular seal. Grouting <br /> procedures will be subject to inspection by PHS-EHD personnel. A traffic-rated well box will be <br /> installed over the wells in accordance with San Joaquin County regulations. Following completion <br /> of the monitoring wells, well elevations and locations will be surveyed by AGE personnel, relative <br /> to monitoring well MW-1. <br /> 3.4. WELL DEVELOPMENT <br /> Development will consist of a combination of bailing to remove the major portion of fine-grained <br /> sediment from inside the well, surging to flush out or draw in sediment from the filter pack, and <br /> additional bailing to finish the removal of sediment. Development activities will be continued until <br /> field parameter(pH, electrical conductivity, and temperature) readings have stabilized. <br /> 3.5. GROUNDWATER SAMPLING PROCEDURES <br /> Groundwater sample collection will be performed in accordance with pertinent applicable sampling <br /> protocols. <br /> 3.5.1. Static Water Level Measurements <br /> Before sampling and during quarterly ground water monitoring, static water level will be measured <br /> using an electric water level indicator. Water level data will be recorded to the nearest 0.01 foot from <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.