My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:40:37 PM
Creation date
4/7/2020 1:26:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OLYMPIAN OIL.CPANY <br /> Page 2 <br /> 1. help the responsible party undertake the necessary corrective action in a cost-effective, <br /> efficient and timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective <br /> action alternative before any corrective action work was performed; and <br /> I <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative j <br /> required by the regulatory agency to achieve the minimum cleanup necessary to protect <br /> human health, safety and the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated <br /> immediate hazard to public health,or the environment. Program regulations allow the <br /> —_ responsible party to undertake interim remedial action after: (1)notifying the regulatory agency <br /> of the proposed action,and; (2)complying with any requirements that the regulatory agency may <br /> set. Interim remedial action should only be proposed when necessary.to mitigate an immediate <br /> demonstrated hazard.Implementing interim remedial action does not eliminate the <br /> requirement for a CAP and an evaluation of the most cost-effective corrective action <br /> alternative. f <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory <br /> agency to protect human health,safety and the environment can be claimed for reimbursement. <br /> You must comply with all regulatory agency time schedules and requirements and you must <br /> obtain three bids for any required corrective action. Unless waived in writing,you are required- <br /> to <br /> equiredto obtain preapproval of costs for all future corrective action work. If you do not obtain three <br /> bids and cost preapproval,reimbursement is not assured and costs may be rejected as <br /> ineligible. <br /> I <br /> If you have any questions,please contact me at(916)227-2784. <br /> Sincerely, <br /> I <br /> Pamela Rarick <br /> Claim Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Mr. Ray Bruun Ms. Margaret Lagorio <br /> RWQCB, Reg. 5 - Fresno San Joaquin County EHD <br /> 3614 E. Ashlan Ave. P.O. Box 2009 <br /> Fresno,CA 93726 Stockton, CA 95201 <br /> I <br /> I <br /> I <br /> i <br /> Our mission is to preserve and enhance the quality of California's water resources,and <br /> 1? Recycled Paper ensure their proper allocation and efficient use for the benefit of present and future generations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.