My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:40:37 PM
Creation date
4/7/2020 1:26:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> 2 <br /> )dLLYMPI <br /> A -it) <br /> 08 Flag —? PH I: 22 <br /> January 29, 1998 <br /> James DiGiorgio <br /> California Water Resources Control Board <br /> - _ _Cl eanup',.Fund-Unit_. .- <br /> 2014 T Street - P.O. Box 944212 <br /> Sacramento, CA 94244-2120 <br /> RE: APPLICATION TO FUND - CLAIM NO: 012820 <br /> JIMCO TRUCK PLAZA <br /> 22722 South Highway 99 <br /> Ripon, CA 95366 <br /> Dear Mr. DiGiorgio: <br /> As we discussed in our telephone conversation of January 23`d morning, subject application is <br /> based on the high probability that there is additional soil contamination from dispenser seepage' <br /> in the areas under the pump islands. <br /> This contamination will be investigated, confirmed, and remediated during the scheduled <br /> removal and replacement of all the single wall USTs, pump islands, and related piping in <br /> April 1998. Presently, we are in the plans development - permitting phase of this project. <br /> Construction contractor selected will be Walton Engineering. <br /> - - `Please call'me if you'will needaryadditiorial information in order to process this claim. <br /> Si ly, <br /> Dan Koch <br /> Environmental/Safety Officer <br /> cc: Mary Meays, Senior REHS-San Joaquin County Environmental Health1" <br /> 260 Michelle Court <br /> South San Francisco <br /> California 94080.6297 <br /> 650.873.8200 <br /> Dan/Jimco 126 FAX 650.871.2264 <br />
The URL can be used to link to this page
Your browser does not support the video tag.