My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:40:37 PM
Creation date
4/7/2020 1:26:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMBRIA <br /> FEASIBLITY TESTING WORK PLAN <br /> JIMCO TRUCK PLAZA <br /> 1022 FRONTAGE ROAD <br /> RIPON, CALIFORNIA <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION.............................................................................................................1 <br /> 2.0 SITE BACKGROUND......................................................................................................1 <br /> 2.1 SITE DESCRIPTION ............................................................................................................. 1 <br /> 2.2 HISTORICAL SITE OPERATIONS.......... ......*"***"*"*'*'*"*.................... 1 <br /> 2.3 GEOLOGY..........................................................................................................................2 <br /> 2.4 HYDROGEOLOGY................................................................................................................2 <br /> 2.4 SENSITIVE RECEPTOR SURVEY...........................................................................................2 <br /> 3.0 PREVIOUS INVESTIGATIONS.....................................................................................3 <br /> 4.0 CONTAMINANT DISTRIBUTION................................................................................5 <br /> 4.1 LATERAL EXTENT OF CONTAMINATION .................................................................................5 <br /> 4.2 VERTICAL EXTENT OF CONTAMINATION................................................................................6 <br /> 5.0 PROPOSED SCOPE OF WORK.....................................................................................6 <br /> 5.1 PRE-FIELD ACTIVITIES........................................................................................................7 <br /> 5.1.1 Site Health and Safety Plan ......................................................................................7 <br /> 5.1.2 Permit........................................................................................................................7 <br /> 5.1.3 Utility Clearance........................................................................................................7 <br /> 5.2 AIR SPARGE WELL INSTALLATION........................................................................................7 <br /> 5.3 WELL ELEVATION SURVEY..................................................................................................8 <br /> 5.4 FEASIBILITY TESTING..........................................................................................................8 <br /> 5.4.1 SVE and Air Sparge Testing Protocol.......................................................................8 <br /> 5.4.2 Equipment and Instrumentation................................................................................9 <br /> 5.6 INVESTIGATION DERIVED WASTE(IDW) ............................................................................ 10 <br /> 6.0 REPORTING...................................................................................................................10 <br /> 7.0 SCHEDULE.....................................................................................................................10 <br /> 8.0 REFERENCES................................................................................................................11 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.