My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:40:37 PM
Creation date
4/7/2020 1:26:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yeasibility Testing Work Plan <br /> Jimco Truck Plaza <br /> Road <br /> C A M B R I A 1022 Frontage R o <br /> Ripon,California <br /> May 18,2005 <br /> 5.1 Pre-Field Activities <br /> Prior to initiating field activities Cambria will conduct the following tasks: <br /> 5.1.1 Site Health and Safety Plan <br /> A site-specific health and safety plan will be prepared to educate site workers and minimize their <br /> exposure to potential hazards related to site activities. <br /> 5.1.2 Permit <br /> A well installation permit will be obtained from SJCEHD. Also,Cambria will notify the San Joaquin <br /> Valley Unified Air Pollution Control District prior to performing the SVE/AS pilot test. <br /> 5.1.3 utility Clearance <br /> The proposed drilling location will be pre-marked with white paint and Underground Service Alert <br /> (USA)will be notified of the drilling activities at least 72 hours before work begins. A private utility <br /> locator may be retained to clear the proposed drilling location of any unmarked utilities. <br /> 5.2 Air Sparge Well Installation <br /> Cambria proposes to install air sparge well (AS-1) between wells EW-1, MW-1, and MW-9 (See <br /> Figure 3). The air sparge well will be located approximately 10 feet away from extraction well EW-1 <br /> and 15 feet away from observation well MW-1 to assist with feasibility testing. The well will be <br /> manually cleared using a hand auger and/or post hole digger to approximately 5 feet bgs. The well <br /> pilot boring will be drilled using a hollow stem auger drill rig equipped with 8-inch diameter <br /> continuous flight augers. During drilling,undisturbed soil samples will be collected at approximate 5 d jc_ . <br /> foot_ intervals with a California-modified split-spoon sampler lined with brass tubes. The soils will <br /> visually examined and classified in a general accordance with Unified Soil Classification System 1 �` <br /> �sw <br /> (USCS). The onsite geologist will record information including lithology,headspace readings,blow <br /> counts, and depths on the boring log form. G, ,✓ 2�, <br /> The anticipated target depth for the air sparge well is approximately 33 feet bgs. Based on previous <br /> borings drilled in the immediate vicinity, a lower permeability layer of soil comprised of <br /> predominantly silts is anticipated to be present at approximately 33 feet bgs. The air sparge well will <br /> be constructed so the screen interval sits atop this lower permeability layer at approximately 10 below <br /> the top of the water table. Should this low permeability layer be found at a depth other than 33 feet <br /> bgs,the well construction will be modified accordingly.The pilot boring will be drilled using 8-inch <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.