Laserfiche WebLink
feasibility Testing Work Plan <br /> Jimco Truck Plaza <br /> C A M B R I A 1022 Frontage Road <br /> Ripon,California <br /> May 18, 2005 <br /> will be used to measure vapor extraction flow rates and temperature. Magnehelic gauges will be used <br /> �} t measure the vacuum applied at the wellhead and induced in the observation wells. A Solinist water <br /> lev meter will be used to measure the depth of groundwater in the observation wells. A Thomas <br /> Indus 'es vacuum pump will be used to collect soil vapor samples in one-liter Tedlar bags for <br /> laborat analysis. <br /> 5.6 Inv stigation Derived Waste (IDW) <br /> Investigation d rived waste(IDW)generated during the site assessment activities will be temporarily <br /> stored onsite in epartment of Transportation-approved 55-gallon drums. Following review of <br /> analytical results a d disposal profiling, the IDW will be transported to an appropriate facility for <br /> disposal/recycling. S <br /> 1 <br /> 6.0 REPORTING <br /> �Q1 <br /> in the field ac 'vities Cambria will prepare and submit a Feasibility Study/Corrective <br /> Upon completing P P <br /> Action Plan(FS/CAP)to the S CEHD detailing the findings of the feasibility testing activities. At a <br /> minimum,this report will contai : <br /> Summary and evalu tion of the feasibility testing activities; <br /> Tabulated test paramet data and analytical results; <br /> Feasibility testing field da sheets; <br /> Analytical reports and chain- f-custody forms; <br /> Comparison of various remedia lternatives; and <br /> Remedial approach recommendati s. <br /> 7.0 SCHEDULE <br /> Upon receiving written work plan approval from the JCEHD, Cambria will commence <br /> implementation of the work plan. Cambria will submit an FS/C to SJCEHD within approximately <br /> 8 weeks following the completion of field activities. <br /> 10 <br /> fi <br />