Laserfiche WebLink
Project: Ripon Farm Se ice Project No.: A -NC-95-0137 BORING NO.: <br /> Site Address: 22871 South Highway 99 Total Depth: 30 Feet -B22 <br /> Ripon, California Date: 13 May, 1998 MW-8 <br /> Drilling Co.: Mitchell Drilling Environmental Logged by: Little Page i of 1 <br /> Rig/Auger Type: CME 75 / 10' Reviewed by: Henderson <br /> Lithalogtel3escripiton <br /> B22-5 0 11/13/17 CL Tan, moist,silty CLAYS no hydrocarbon(HC)odor. <br /> 10— B22-10 0 12/18/26 CL same as described above <br /> B22-15 0 12/27/40 CL same as described above <br /> 2 B22-20 0 12/.13/17 SM6 Gray,moist to wet,silty SANS, no HC odor. <br /> 25 B22-25 0 12/18/16 SM same as described above,slight HC odor. <br /> SM <br /> 3 B22-30 0 12/16/17 same as described above <br /> Boring terminated at 30 feet. <br /> Ground water encountered at 19 feet <br /> Boring completed as ground water well MSV-8. <br /> Advanced <br /> GeoEnvironmental, Inc. <br /> 1 IAMIPR0%RnP1Nr_1%RGCMINH CAM -- <br />