My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:40:37 PM
Creation date
4/7/2020 1:26:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CA �MBRIA <br /> May 18,2005 <br /> Ms. Victoria L. McCartney <br /> San Joaquin County Environmental Health Department <br /> I <br /> 304 East Weber Avenue, 3`d Floor <br /> Stockton, California 95202 MAY 2 0 2005 <br /> Re: Work Plan for Additional Site Assessment EhVIRONENT HEALTH <br /> JIMCO Truck Plaza PERMIT/SERViCEES <br /> 1022 Frontage Road (Formerly 22502 S. Highway 99) <br /> Ripon, California VQ t <br /> Site Code 1604 0J b v <br /> Cambria Project# 165-1556 <br /> Dear Ms. McCartney: <br /> On behalf of Olympian JV,Cambria Environmental Technology;Inc.has prepared this Work Plan for <br /> Additional Site Assessment at the above-referenced site. <br /> If you have any questions or comments regarding this submittal,please call me at(510)420-3355. <br /> I <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Brandon S. Wilken, <br /> Project Geologist <br /> i <br /> i <br /> Attachment: Work Plan for Additional Site Assessment <br /> r <br /> cc: Ms.Janet Heikel Olympian JV,1200 Industrial Road,Suite 2,San Carlos,California 94070 <br /> Mr.James Barton,RWQCB-CVR, 11020 Sun Center Drive#200,Rancho Cordova,CA 95670-6114 <br /> i <br /> fI <br /> Cambria <br /> Environmental <br /> I <br /> Technology,Inc. > <br /> 5900 Hollis Street <br /> Suite A <br /> 4 <br /> Emeryville,CA 94608 <br /> Tel(510)420-0700 <br /> Fax(510)420-9170 <br /> i <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.