Laserfiche WebLink
Yor <br /> Work P1anAdditional Site Assessment <br /> 1022 Frontage Road,Ripon, California <br /> C A M B R I A July 2s, 2006 <br /> Advance three cone penetration test(CPT)borings in the vicinity of the former USTs,MW-6, <br /> and west of the former USTs to obtain electronic lithologic logs and depth-discrete <br /> groundwater samples. <br /> les.P <br /> li <br /> The locations of the proposed borings are shown on Figure 3. <br /> 5.1 Pre-Field Activities <br /> Prior to initiating field activities Cambria will conduct the following tasks: <br /> 5.1.1 Site Health and Safety Plan <br /> A site-specific health and safety plan will be prepared to educate site workers and minimize their <br /> exposure to potential hazards related to site activities. <br /> 5.1.2 Permits <br /> A soil boring permit will be obtained from SJCEHD. <br /> 5.1.3 Utility Clearance <br /> The proposed drilling locations will be pre-marked with white paint and Underground Service Alert <br /> (USA)will be notified of the drilling and sampling activities at least 72 hours before work begins. A <br /> private utility locator will also be retained to clear the proposed drilling locations of any unmarked <br /> utilities. To avoid hitting any subsurface utilities, the first eight feet of each soil borings will be <br /> advanced using a hang auger and thereafter using a direct push rig Geoprobe°or CPT rig. ,r Psis d <br /> ICA <br /> 5.2 Soil and Groundwater Sampling Using Geoprobe 01 WU 'I YO r2 Each Geoprobe°boring will be advanced to a depth of approximately 25 ft bgs,and if necessary,the <br /> borings maybe advanced deeper to vertically delineate petroleum hydrocarbons in soil. Previously <br /> -� collected soil data demonstrates that the majority of petroleum hydrocarbon impact is detected above <br /> 11 �--25 ft bgs(Table 1). During drilling,undisturbed soil samples will be continuously collected using a <br /> four-ft barrel sampler lined with acetate sleeves. Soil will be visually examined and classified in a <br /> general accordance with Unified Soil Classification System(USCS). Field screening of hydrocarbons G <br /> will include visual and/or olfactory observations, and photoionization detector (PID) readings. <br /> Pertinent information including soil lithology,PID readings,and sample depths will be recorded on a 5d <br /> soil boring log. Grab groundwater samples will be collected from the open borehole using a new <br /> disposal bailer. Once a groundwater sample has been collected,the soil boring will be trernie grouted <br /> from the bottom up using cement grout.Cambria's standard field procedures for Geoprobe°sampling <br /> are presented as Attachment C. <br /> 7 <br />