Laserfiche WebLink
Work Plan Additional Site Assessment <br /> 1022 Frontage Road,Ripon,California <br /> C A M B R I A July 25,2006 <br /> 6.0 REPORTING <br /> i <br /> Upon completing the field activities,Cambria will prepare and submit a Site Assessment report to the <br /> SJCEHD detailing the findings of the additional site assessment activities. At a minimum,this report <br /> will contain: <br /> i <br /> • The findings of site assessment activities; <br /> i <br /> • Descriptions of the soil boring drilling methods; <br /> • Descriptions of the soil and groundwater sampling methods; <br /> • Figures depicting the lateral extent of the hydrocarbon plume and groundwater flow <br /> direction; <br /> • Cross-sections depicting the lateral and vertical extent of impacted soil and <br /> groundwater; <br /> • Tabulated soil and groundwater analytical results; <br /> • Soil boring logs; <br /> i <br /> • Analytical reports and chain-of-custody forms; <br /> • Soil and groundwater disposal methods; and <br /> • Our conclusions and recommendations. <br /> 7.0 SCHEDULE <br /> Upon receiving written work plan approval from the SJCEHD, Cambria will commence <br /> implementation of the work plan. Cambria will submit a Site Assessment Report to SJCEHD within <br /> approximately 8 weeks following the completion of field activities. <br /> 9 <br />