My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:44:24 PM
Creation date
4/7/2020 1:29:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. +.5EamunD G.BIgwR JR. <br /> eevswDR <br />. oaa n o e a u - � M.in�er FlDurDuez _ <br /> waxer Boards <br /> lRYrR71rfQRRY.NID1lCR011 <br /> Central Valley Regional Water Quality Control Board = <br /> 12 April 2012 <br /> Ms. Janet Heikeld <br /> Olympian <br /> 1300 Industrial Road, Ste. 2 <br /> San Carlos, CA 94070 <br /> DIRECTIVE LETTER, JIMCO TRUCK PLAZA, 1022 EAST FRONTAGE ROAD <br /> (AKA'22502 SOUTH HIGHWAY 99), RIPON, SAN JOAQUIN COUNTY <br /> (REGIONAL BOARD CASE#390718) <br /> The required Public Participation Period was conducted from 10 March 2012 to <br /> 10 April 2012 with no comments received by this agency. In order to move into the next <br /> phase of the closure process, you are directed to submit a work plan to destroy all <br /> monitoring wells in accordance with San Joaquin County Environmental Health <br /> Department well destruction requirements. The well destruction work plan is due <br /> 15 May 2012. <br /> Upon my review and subsequent approval of the work plan, you are to acquire the <br /> necessary SJCEHD permits, destroy all of the wells, properly dispose of all wastes, and <br /> submit a well destruction report within 90 days of the work plan approval date, or <br /> prove a schedule by within 15 days of the work plan approval date with the reasons <br /> for the delay. <br /> If you have any questions, you can contact me at (916) 464-4615 or I can be reached <br /> by e-mail at ibarton(c-Dwaterboards.ca.gov. <br /> /s/original signed by <br /> James L.L. Barton, P.G. <br /> Engineering Geologist <br /> cc: Nuel Henderson, San Joaquin County Environmental Health Department, <br /> Stockton <br /> Ron Scheele, Conestoga-Rovers & Associates, 5900 Hollis St., Ste. A, <br /> Emeryville 94608 <br /> KARL E.LaKftev BGD,P.E.,cmwt I PAmeLA C.CRKDOM P.E.,BCEE,mmomme awww <br /> 1 f 026 Burt QenCer DAfr�1200,FtswFq Cardor;C;A 96670 I www.waterhoards.aQ.por/aentralvall�y <br /> ' �,RGDTCLiD PAPGR <br />
The URL can be used to link to this page
Your browser does not support the video tag.