Laserfiche WebLink
Q1SitProject: 12ipon harm Service Project No-: AGF-NC-95-0137 BO-PJNC N61- <br /> Site <br /> e Address: 22871 South Highway 99 Total Depth: 30 Peet _B—2,Ripon, California <br /> Date: 12 May 1998 MW's <br /> Drilling Co.:' Mitchell Drilling L'n Vixannienial Logged by: Little Page 1 of 1 <br /> Rig/Auger Type: CMI:75/ 10' - - -- - - Reviewed by: Henderson <br /> mg 6:.,�,� <br /> Tan,silty clay anger returns <br /> NS <br /> CL Tan,moist,silty CLAY;no hydrocarbon(HC)odor- <br /> 10— 824-10 0 11/]7/21 SM Tan,moist, silty SAND;no HC odor. <br /> B20-15 0 19/17/21 SP Tan,moist,silty SAND;no HC odor. <br /> 20— B20-20 17.6 19/20/21 SP 7Gray,wet,silty SAND;intense IAC odor_ <br /> . _ h <br /> i <br /> 1 <br /> i <br /> 25 B20-25 6.5 17/12/21 CL Tan,saturated,silty,gavel CLAY;slight HC odor. <br /> i <br /> 30— .H2O-30 0 17/30/10 SM Gray,saturated,silty SAND;slight HC odor. l <br /> t <br /> j <br /> Boring terminated at 30 feet- <br /> Ground water encountered at 19 feet f <br /> Boring completed as ground water well MW-6. <br /> h <br /> Advanced <br /> G_eoEnvzronmental,,Inc. <br /> IIGMIPAh1R/IAIIJ!__11ACCnnG CDI �i - I <br /> k <br />