Laserfiche WebLink
Site Assessment Work Plan <br /> -1022 Frontage Road,Ripon, California <br /> CONESTO -A-ROVERS March 7, 2008 <br /> &ASSOCIATES - <br /> 5.1 Pre-Field Activities <br /> Prior to initiating field activities CRA will conduct the following tasks: <br /> 5.1.1 <br /> 'Site Health and Safety Plan <br /> A site-specific health and safety plan will be prepared to educate site workers and minimize their exposure <br /> to potential hazards related to site activities. " <br /> 5.1.2 Permits <br /> A soil boring permit will be obtained.from SJCEHD. <br /> 5.1:3 Utility Clearance <br /> The proposed drilling locations will be pre-marked with white paint and Underground Service Alert(USA) <br /> will'be notified of the"drilling'and sampling activities at least 72 hours before work begins. A private <br /> utility locator will also be retained to clear the proposed drilling locations of any unmarked utilities.-To <br /> avoid hitting any subsurface utilities,the first eight feet of each soil borings will be advanced using a hang <br /> auger and thereafter using a direct push Geoprobe <br /> 5.2,, Soil and Groundwater Sampling Using=Geoprobe® <br /> Each Geoprobe boring will be advanced to a depth of approximately 30.ft bgs,or deeper if necessary,to <br /> vertically delineate petroleum hydrocarbons in.Soil.- Previously collected soil data demonstrates that the <br /> majority of±petroleum hydrocarbon impact is detected above 25 ft bgs fTabl&A). During drilling, . <br /> undisturbed,soil samples will be continuously collected approximately every five feet,using a four-ft barrel - <br /> sampler lined with.acetate sleeves. Soil will be visually examined and classified in a general accordance <br /> with Unified Soil Classification System.(USCS). Field screening of hydrocarbons will include visual <br /> = and/or olfactory observations,and photoionization detector(PID)readings.Pertinent information including <br /> soil lithology,PID readings, and sample depths will be recorded on a soil boring log.Grab groundwater <br /> samples will be collected from the open borehole using a new disposal bailer. Once a groundwater sample <br /> has been collected,the soil boring will be tremie grouted from the bottom up using cement grout.CRA's <br /> standard field procedures for Geoprobe sampling are presented as Attachment C. ' <br /> 5.3'' Soil Boring Survey <br /> Upon completing the drilling activities,CRA will retain the services of licensed surveyor to survey the <br /> coordinates•and elevations of the soil boring. -Survey data`will:be tied to a local benchmark:. <br /> Worldwide Engineering,Environmental,Construction,and IT Services - <br />