My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2005-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_2005-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:14:35 PM
Creation date
4/7/2020 2:34:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2005-2014
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As this is still a month out, I realize tthis is hard to plan out. • <br /> Once you get onsite and start the work,call my cell phone or e-mail me,and let me know when we are getting close,so I <br /> can be onsite for the grouting. <br /> Johnny Yoakum <br /> Johnny Yoakum <br /> Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> (209)468-3147 desk <br /> (209) 601-0429 cell <br /> jyoakum @sjcehd.com<mailto:jyoakum@sjcehd.com> <br /> From: DeSmet, Mike [mailto:mike.desmet@urs.com] <br /> Sent: Friday, May 02, 2014 9:20 AM <br /> To:John Yoakum [EH] <br /> Subject: RE: URS Corp. -Sharpe Site-Well Boring Permit Application <br /> Mr.Yoakum,yes we have a schedule for this project.We are now planning to install 3 extraction wells, 1 on the Sharpe <br /> Site, and 2 off-site,specified in the submitted permit. <br /> We will being with the on-site well, Monday,June 2nd.We expect it to take approximately 3 from mob to demob. <br /> So,tentatively, we would begin drilling within the UPRR parcel Thursday,June 5 and would possibly need a grout <br /> inspection Friday,June 6.This is assuming we begin drilling the shallow well (EWCA2). If this conflicts with your schedule <br /> we can begin the deeper well (EWNC6).As long as we are drilling somewhere we are happy with that progress. <br /> Please let me know if you have any other questions or need anything else from us. <br /> Michael DeSmet <br /> Geologist <br /> URS Chico <br /> 1550 Humboldt Road, Suite#2 <br /> Chico, CA 95928 <br /> P: 530.893.9675 <br /> C:916.230.4301 <br /> F: 530.893.9682 <br /> From:John Yoakum [EH] [mailto:JYoakum@sjcehd.com] <br /> Sent: Friday, May 02, 2014 8:50 AM <br /> To: DeSmet, Mike <br /> Subject: RE: URS Corp.-Sharpe Site-Well Boring Permit Application <br /> Mike, <br /> Do you have a tentative schedule for this project? <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.