Laserfiche WebLink
revise the Plan and notify the Permittee of the revisions. This <br /> Director-revised Plan becomes the approved SVMU Assessment Plan. <br /> The Permittee shall implement the Plan within thirty (30 ) <br /> calendar days of receiving written approval. <br /> 5. The Permittee shall submit a SVMU Assessment Report to the <br /> Director no later than sixty (60) calendar days from completion <br /> of the work specified in the approved SVMU Assessment Plan. The <br /> SVMU Assessment Report shall describe all results obtained from <br /> the implementation of the approved SVMU Assessment Plan. At a <br /> minimum, the Report shall provide the following information for <br /> each of the newly-identified SVMU. <br /> a. The location of the newly-identified SVMU in relation to <br /> other SVMUs; <br /> b. The type and function of the unit; <br /> C. The general dimensions , capacities and structural <br /> description of the unit; <br /> d. The period during which the unit was operated; <br /> e. The specifics on all wastes that have been or are being <br /> managed at the SVMU, to the extent available; and <br /> f. The results of any sampling and analysis required for the <br /> purpose of determining whether release of hazardous wastes <br /> including hazardous constituents have occurred, are <br /> occurring, or are likely to occur from the unit. <br /> 6. Based on the results of this report, the Director shall determine <br /> the need for further investigations at specific unit(S) covered <br /> in the SVMU Assessment. If the Director determines that such <br /> investigations are needed, the Director may require the 'Permittee <br /> to prepare a plan for such investigations. <br /> D. NOTIFICATION REQUIREMENTS FOR NEWLY-DISCOVERED RELEASES AT SVMUS <br /> The Permittee shall notify the Director, in writing, of any <br /> release ( s ) of hazardous waste including hazardous constituents <br /> discovered during the course of ground-water monitoring, field <br /> investigation, environmental auditing or other activities undertaken <br /> after the commencement of the SVMU investigation, no later than <br /> fifteen (15) calendar days after discovery. Such newly-discovered <br /> releases may be from newly-identified units, from units for which, <br /> based on the findings of the RIR, the Director had previously <br /> determined that no further investigation was necessary, 'Or -from units .. _--- <br /> being investigated. <br /> E. DETERMINATION OF NO FURTHER ACTION <br /> 1. Based on results of the SVMU investigation and other relevant <br /> information, the Permittee may submit an application to the <br /> 29 <br />