My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 2:59:29 PM
Creation date
4/7/2020 2:38:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1992
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D R' A F T <br /> 10.30 ASTM-D-2216, 1990, Laboratory Determination of water (Moisture) <br /> Content of Soil, Rock, and Soil-Aggregate Mixtures <br /> 10.31 ASTM-D-4318, 1984, Liquid Limit, Plastic, and Plasticity Index of <br /> Soils. <br /> 11.0 MANAGEMENT OF FUNDS <br /> The following matrix establishes the funding allocation structure by <br /> task for this delivery order. Funds for this delivery order will be managed <br /> at the level specified in this matrix. No transfer of funds by the AE between <br /> tasks will be allowed without prior approval of the Contracting Officer or the <br /> Contracting Officer's representative. <br /> ALLOCATED FUNDING STRUCTURE BY TASK <br /> Total <br /> Negot. Funded <br /> Total Cost Est. Total <br /> Negot. Est. Negot. Negot. Growth/ Reimb. Funded Funded <br /> Task Reimb Costs Fixed-Fee Costs Underuns Costs Fixed-Fee Costs <br /> 1 <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> AA-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.