My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 2:59:29 PM
Creation date
4/7/2020 2:38:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1992
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(12) March 12, 1992 : Sharpe' s Groundwater Treatment System <br /> Discharge, NPDES Monthly Report for the month of February 1992. <br /> (13) March 30, 1992: Sharpe' s Annual Progress Report for the period <br /> of January 1 , 1991 through December 31, 1991. <br /> (14) April 3, 1992: Sharpe Facility, Agricultural Water Supply <br /> Alternative Study, March 1992. <br /> (15) April 3, 1992: "Draft" Record of Decision and Response Summary <br /> for Groundwater Remedial Work at DDRW Sharpe. Replacement pages were sent <br /> out April 9, 1992. <br /> (16) April 14, 1992: Sharpe' s Groundwater Treatment System, NPDES <br /> Monthly Report for the month of March 1992. <br /> b. Meetings with Regulatory Agencies: <br /> (1) January 23, 1992: Project Manager' s Meeting at DDRW Sharpe, <br /> Building S-4, Conference Room, Lathrop, California. <br /> (2) January 27, 1992: Project Manager' s Meeting at DDRW Sharpe, <br /> Building S-4, Conference Room, Lathrop, California. All project managers <br /> participated in the evening public meeting held at City of Lathrop' s City <br /> Council Chambers. <br /> c. Other RI/FS Activities: <br /> (1) March 1992: Installed additional wells required for performance <br /> of Central Area Pump Tests. <br /> (2) March - April 1992: Performed Central Area Pump Tests. <br /> (3) March - April 1992: Installed injection wells and injection <br /> observation wells. Started injection tests. <br /> 5. REMEDIAL_, REMOVAL, AND INVESTIGATION ACTIVITIES: Remedial and/or removal <br /> activities. <br /> a. The North and South Balloon Groundwater Treatment Systems continued <br /> to operate during this report period. More details on the operation of the <br /> system are included in the monthly NPDES Report. <br /> b. New extraction wells NC-2R and NC-3R were connected to the North <br /> Balloon Groundwater Treatment System during the quarter. <br /> 6. REMEDIAL, REMOVAL, AND INVESTIGATION ACTIVITIES: Other Activities <br /> - 25 March 1992: Meeting with (Mr. Fred Bosley, William Lyon Company, <br /> and Mr. Russ Mensen, Verner Construction Company) representatives from Lyon <br /> Communities Property west of Sharpe. <br />
The URL can be used to link to this page
Your browser does not support the video tag.