My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2004-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_2004-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 2:56:47 PM
Creation date
4/7/2020 2:44:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2004-2014
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Provide a summary of DDJC's IRP Program <br /> • Provide program updates since the last Community Update Forum meeting <br /> • Summarize the DDJC-Sharpe Five-Year Review Report <br /> Mr. Guzman used the organizational chart to describe the DDJC-Sharpe Program Team, <br /> including brief descriptions of the roles and responsibilities for each party. <br /> He also provided a general overview of the IRP program from its inception in 1979 with <br /> the commencement of IRP studies. Program highlights include the Federal Facilities <br /> Agreement in 1989; the Groundwater Record of Decision in 1993;Removal Actions <br /> completed; and the present submittal of the Five-Year Review Report in 2003. See the <br /> presentation copy(attached)for additional milestone dates. <br /> Mr. Guzman described the primary Chemicals of Concern at the Sharpe depot(volatile <br /> organic compounds [VOCs],trichloroethene [TCE] and tetrachloroethene [PCE],with <br /> lesser amounts of lead,chromium, arsenic,pesticides and petroleum) and their past uses. <br /> He mentioned the start-up dates for each of the three groundwater extraction treatment <br /> plants: <br /> • 1987 for South Balloon Groundwater Treatment Plant <br /> • 1990 for North Balloon Groundwater Treatment Plant <br /> • 1995 for Central Area Groundwater Treatment Plant <br /> Mr. Guzman reported that the groundwater remedy for DDJC-Sharpe and the continued <br /> Remedial Process Optimization of the Long Term Monitoring/Operations and <br /> Maintenance Programs would be utilized to minimize costs and reduce clean-up time <br /> Mr. Guzman described DDJC-Sharpe community relations process, which includes: <br /> • Updates to the Community Relations Plan approximately every two years, <br /> including community interviews <br /> • Community outreach through Environmental Update Fact Sheets <br /> • Community Update Forum meetings <br /> Mr. Guzman concluded by stating that DDJC is committed to keeping the community <br /> informed regarding DDJC-Sharpe environmental issues now and in the future. <br /> Mr. Guzman introduced Tom Cudzilo,URS,who presented a summary of the DDJC- <br /> Sharpe Five-Year Review Report. <br /> Mr. Cudzilo stated that the purpose of the report was to determine if cleanup activities at <br /> DDJC-Sharpe are protecting human health and environment.The report reviewed the <br /> activities being undertaken to clean up metals and pesticide contamination in soil in three <br /> areas and VOCs in soil in six areas.The report also addressed progress in cleaning up <br />
The URL can be used to link to this page
Your browser does not support the video tag.