Laserfiche WebLink
• DDJC-Sharpe Permanent'Pezometer Installation Work Plan <br /> Addendum GMS Boundary Condition Verification <br /> 4.1.2 The data assessment effort includes the 5.0 REFERENCES <br /> evaluation and screening of field data for <br /> acceptable accuracy and precision. All data will Radian International, 1997. EDMS Data <br /> be reduced and tabulated in a systematic manner Exchange Protocol. <br /> to facilitate review. The data reduction may <br /> include evaluation by GIS,graphic representa- Radian International, 1998. Groundwater <br /> tion, or other methods that will facilitate Modeling System Boundary Cond ion <br /> analysis of data and conceptualization of results. Verification Work Plan, DDJC-S rpe. <br /> The data evaluation procedures will utilize the August. <br /> DDJC-Sharpe Environmental Data Management <br /> System(EDMS).The EDMS allows concurrent URS,2001. DDJC-SharpelTracy Sites <br /> evaluation of different types of data including Comprehensive Field Work Plan. <br /> hydrogeologic,geologic,chemical,geophysical, Volume 1,Version 3.0.February. <br /> and institutional data. <br /> 4.2 Reporting Requirements <br /> 4.2.1 Technical Reports <br /> An ETM will be prepared summarizing the <br /> results of the work effort.The ETM will include <br /> test results,CPT data, location northing and <br /> easting coordinates,top of casing elevations, <br /> ground surface elevations,and groundwater <br /> elevations. <br /> 4.2.2 Field Data Reporting <br /> 4.2.2.1 Field data reporting includes electronic <br /> and hard copy deliverables. Field data hard copy <br /> deliverables include field data sheets(e.g., CPT <br /> print outs, boring logs). The electronic project <br /> data,including available CPT and survey data, <br /> will be prepared as electronic data files that <br /> conform to the latest format specified in the <br /> EDMS Data Exchange Protocol(Radian <br /> International, 1997). The files will be delivered <br /> as ASCII text files that will be imported into the <br /> EDMS. <br /> 4.2.2.2 Daily field progress reports will be <br /> provided to CEHNC and DDJC-Sharpe staff on <br /> the morning following each day any field work <br /> occurred. The field progress reports will note <br /> work accomplished,data collected,problems <br /> encountered and actions taken, and the work <br /> planned for the following day. <br /> K:\02238\Sharpe Piez WP\CPT addendum Sharpe.dm 5 M=1 2002 <br />