My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 • • <br /> • <br /> MRS <br /> 41-F0602238.00 22610 <br /> 9 November 2001 <br /> Mr. Jarel Starling <br /> U.S. Army Corps of Engineers NOV 0 9 2o9I <br /> Engineering and Support Center, Huntsville <br /> ATTN: CEHNC-IS-FS <br /> 4820 University Square <br /> Huntsville, AL 35816-1822 <br /> SUBJECT: Submission of Revised Final Work Plan, Well 2 Abandonment, DDJC- <br /> Sharpe, Well Management/Field Support (DACA87-95-D-0001UT003840) <br /> Dear Mr. Starling: <br /> Enclosed are four copies of the revised final work plan to accomplish the abandonment of ell 2 <br /> at DDJC-Sharpe, including demolition of the pumphouse that houses the well surface <br /> • completion. This revised final work plan incorporates CEHNC comments received on the fi ..al <br /> work plan that was completed under Task Order(TO) 27 and submittal on 9 September 1999 <br /> (Form 7 responses are attached to this cover letter). This revised final work plan may be inserted <br /> into the binder containing the September 1999 work plan. This work is being performed under <br /> TO 38,Well Management/Field Support, Subtask 2fa(Modification 5 to TO 38). Field work is <br /> currently scheduled to begin in December 2001. <br /> This letter and revised final work plan have also been sent to DDJC-FA (J. Guzman), RW B <br /> (M. Pierce), and SJCEHD (H. Knoll). If you have any questions or comments, please call me at <br /> (916) 679-2069 or Dick Van Dyke at(916) 679-2267. <br /> Sincerely,//// <br /> /)_ Graham D. Sharpe, P.E. <br /> 1�"" Program Manager <br /> c: John Guzman (DDJC-FA) <br /> Steve Noll (CEHNC-ED-CS) <br /> Dick Van Dyke (URS) <br /> Project Files (602238) <br /> is URS Corporation <br /> Crown Corporate Center <br /> 2870 Gateway Oaks Drive, Suite 300 <br /> Sacramento,CA 95833 <br /> Tel:916.679.2000 <br /> Fax:916.679.2900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.