My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. AR NGINEER DIVISION HUNTSVILLE CORPS 8r'ENGINEERS <br /> DESIGN REVIEW COMMENTS PROJECT DDJC-Sharpe SHAD Well 2 Work Plan CN: 10-092-01 S:25 October 2001 <br /> 0 SITE DEV&GEO ❑ MECHANICAL ❑ SAFETY ❑ SYSTEMS ENG T0038-038 <br /> ENVIR PROT&UTIL ❑ MFG TECHNOLOGY ❑ ADV TECH ❑ VALUE ENG REVIEW <br /> ❑ ARCHITECTURAL ❑ ELECTRICAL ❑ ESTIMATING ❑ OTHER DATE 24 October 2001 <br /> ❑ STRUCTURAL ❑ INST&CONTROLS ❑ SPECIFICATIONS NAME S.Nohrstedt C. Kin <br /> ITEM DRAWING NO. COMMENT ACTION <br /> OR REFERENCE <br /> 1. General We have reviewed the Memorandum, Response to Regulatory Comments, (A)No response required. <br /> DDJC-Sharpe SHAD Well 2 Abandonment Work Plan and Downhole Video <br /> dated 10 October 2001. <br /> 2. General The URS response to comments from RWQCB and SJCEHD are appropriate. (A) No response required. • <br /> 3. General The Final Work Plan prepared in September 1999 and the Site Safety and Health (A) The following changes have been incorporated <br /> Plan should be updated to indicate: <br /> • URS is doing the work into the revised final work plan: <br /> • work is being completed under Task Order 38 • "Radian" has been globally changed to "URS". <br /> • work should be coordinated with John Guzman "TO 27" has been globally changed to"TO 38". <br /> • any other relevant changes which have occurred from September 1999 <br /> to present • "Ron Allen" has been globally changed to"John <br /> Guzman"for work coordination. <br /> • Previously identified subcontractors (e.g., Gregg <br /> Drilling) have been changed to"a contractor yet <br /> to be determined". <br /> • Reference to the completed downhole well vi� <br /> and the receipt of review comments on the vi <br /> and final work plan from the RWQCB and <br /> SJCEHD have been added to paragraph 2.1. <br /> • Additional detail describing the grouting <br /> procedure (as requested in comments received <br /> from RWQCB and SJCEHD) has been included <br /> in paragraph 2.9 (e.g., grout pressure <br /> maintenance and PSI;tremie pipe placement; <br /> and grout volume calculation). <br /> ACTION CODES W - WITHDRAWN <br /> A - ACCEPTED/CONCUR N - NON-CONCUR <br /> D - ACTION DEFERRED VE - VE POTENTIAL/VEP ATTACHED <br /> Apr 89 FORM 7 (Revised) <br /> 15 PREVIOUS EDITIONS OF THIS FORM ARE OBSOLETE PAGE 1 OF 1 <br /> 15 Apr <br />
The URL can be used to link to this page
Your browser does not support the video tag.