My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by EPA, DOHS, and RWQCB of a draft final document if dispute resolution i" <br /> not invoked, or as modified by decision of the dispute resolution process. <br /> 12.2.2 Secondary documents include those documents that are discrete. <br /> portions of the primary documents and are typically input or feeder docu- <br /> ments. Secondary documents are issued by SHAD in draft subject to review <br /> and comment by the other Parties. Although SHAD will respond to comments <br /> received, the draft secondary documents will be finalized in the context of <br /> the corresponding primary documents. A secondary document may be disputed <br /> at the time the corresponding draft final primary document is issued. <br /> 12.3 Primary Documents: <br /> 12.3.1 SHAD shall complete and transmit draft documents for the fol- <br /> lowing primary documents to the other Parties for review and comment in <br /> accordance with the provisions of this Section: <br /> 1. Community Relations Plan <br /> 2. Work Plan for remaining RI/FS work (includes Health and Safety <br /> Plan for field work) <br /> 3. Quality Assurance Project Plan (QAPP)(Draft delivered per <br /> Attachment 2) <br /> 4. Initial Screening of Alternatives <br /> 5. RI Report ( Initial draft delivered per Attachment 2) <br /> u. FS Report <br /> 7. Proposed Plan <br /> 8. Record of Decision <br /> 9. Remedial Design <br /> 10. Remedial Action Operations Plan <br /> -19- <br />
The URL can be used to link to this page
Your browser does not support the video tag.