Laserfiche WebLink
by EPA, DOHS, and RWQCB of a draft final document if dispute resolution i" <br /> not invoked, or as modified by decision of the dispute resolution process. <br /> 12.2.2 Secondary documents include those documents that are discrete. <br /> portions of the primary documents and are typically input or feeder docu- <br /> ments. Secondary documents are issued by SHAD in draft subject to review <br /> and comment by the other Parties. Although SHAD will respond to comments <br /> received, the draft secondary documents will be finalized in the context of <br /> the corresponding primary documents. A secondary document may be disputed <br /> at the time the corresponding draft final primary document is issued. <br /> 12.3 Primary Documents: <br /> 12.3.1 SHAD shall complete and transmit draft documents for the fol- <br /> lowing primary documents to the other Parties for review and comment in <br /> accordance with the provisions of this Section: <br /> 1. Community Relations Plan <br /> 2. Work Plan for remaining RI/FS work (includes Health and Safety <br /> Plan for field work) <br /> 3. Quality Assurance Project Plan (QAPP)(Draft delivered per <br /> Attachment 2) <br /> 4. Initial Screening of Alternatives <br /> 5. RI Report ( Initial draft delivered per Attachment 2) <br /> u. FS Report <br /> 7. Proposed Plan <br /> 8. Record of Decision <br /> 9. Remedial Design <br /> 10. Remedial Action Operations Plan <br /> -19- <br />