My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> objection and shall identify any ARARs which it believes were not properly <br /> addressed in the proposed ARAR determination. <br /> 12.7.5 Following the close of the comment period for a draft document, <br /> SHAD shall give full consideration to all written comments on the draft doc- <br /> ument submitted during the comment period. Within sixty (60) days of the <br /> close of the comment period on a draft secondary document, SHAD shall trans- <br /> mit to the other Parties its written response to comments received within <br /> the comment period. Within sixty (60) days of the close of the comment <br /> period on a draft primary document, SHAD shall transmit to the other Parties <br /> a draft final primary document, which shall include SHAD's response to all <br /> written comments received within the comment period. While the resulting <br /> draft final document shall be the responsibility of SHAD, it shall be the <br /> product of consensus to the maximum extent possible. <br /> 12.7.6 SHAD may extend the sixty (60) day period for either responding <br /> to comments on a draft document or for issuing the draft final primary docu- <br /> ment for an additional thirty (30) days by providing notice to the other <br /> Parties. <br /> 12.7.7 In appropriate circumstances, these time periods may be further <br /> extended in accordance with Section 28, Extensions. <br /> 12.7.8 Comments by DOHS and RWQCB under this Section shall be provided <br /> to SHAD through DOHS. <br /> 12.8 Availability of Dispute Resolution for Draft Final Primary Documents: <br /> 12.8.1 Dispute resolution shall be available to the Parties for draft <br /> final primary documents as set forth in Section 13. <br /> 12.8.2 When dispute resolution is invoked on a draft final primary <br /> -23- <br />
The URL can be used to link to this page
Your browser does not support the video tag.