My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
7707
>
2800 - Aboveground Petroleum Storage Program
>
PR0538333
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 8:40:57 AM
Creation date
4/7/2020 3:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0538333
PE
2832
FACILITY_ID
FA0021992
FACILITY_NAME
CDCR-California Health Care Facility
STREET_NUMBER
7707
STREET_NAME
AUSTIN
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
181-100-11
CURRENT_STATUS
01
SITE_LOCATION
7707 Austin Rd
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STI SP001 AST Record <br /> Form completed by(Name) - Date <br /> (Title) <br /> OWNER INFORMATION FACILITY INFORMATION INSTALLER INFORMATION <br /> Name Name Name <br /> Number and Street Number and Street Number and Street <br /> City,State,Zip Code City,State,Zip Code City,State,Zip Code - - -- <br /> Regulatory facility ID number(if applicable) ---------- <br /> OWNER'S TANK ID OTHER ID INITIAL SERVICE DATE <br /> Manufacturer: Contents: Construction Date: Last Repair/Reconstruction Date: <br /> Dimensions: Capacity: Last Change of Product Date: <br /> Design: ❑ UL ❑SwRI ❑API ❑Other ❑Unknown <br /> ❑Horizontal ❑Vertical ❑Rectangular <br /> Construction: ❑Bare Steel ❑Cathodically Protected(Check one:A.❑Galvanic or B.❑Impressed Current)Date Installed: <br /> ❑Coated Steel ❑Concrete encased steel ❑Stainless steel ❑Other <br /> ❑ Double-Bottom ❑ Double-Wall ❑ Lined inside;Date lining installed: <br /> Spill control: ❑ Earthen Dike ❑Steel Dike ❑Concrete CRDM: ❑yes ❑no <br /> ❑None ❑Other If yes,type:❑ Release Prevention Barrier❑Elevated tank ❑Double bottom tank <br /> Tank elevated on supports ❑yes ❑no ❑ Double wall tank ❑CE-AST ❑other <br /> Support material: ❑steel ❑concrete ❑ other <br /> Release Prevention Barrier: ❑yes ❑no If yes, Date Installed: AST Category: ❑Category 1 ❑ Category 2 ❑ Category 3 <br /> If yes,Type:❑concrete❑synthetic liner ❑clay liner ❑ steel ❑other <br /> AST Record Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.