My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
7707
>
2800 - Aboveground Petroleum Storage Program
>
PR0538333
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 8:40:57 AM
Creation date
4/7/2020 3:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0538333
PE
2832
FACILITY_ID
FA0021992
FACILITY_NAME
CDCR-California Health Care Facility
STREET_NUMBER
7707
STREET_NAME
AUSTIN
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
181-100-11
CURRENT_STATUS
01
SITE_LOCATION
7707 Austin Rd
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Is the primary tank free of water or has another preventative measure been taken? <br /> 4 NOTE: Refer to paragraphs 6.10 and 6,11 of the standard for alternatives for Category 1 ❑Yes ❑ NO ❑ N/A <br /> tanks.N/A is only appropriate for these alternatives. - - <br /> 5 For double-wall or double bottom tanks or CE-ASTs, is interstitial monitoring equipment ❑Yes ❑ NO ii N/A - - -- — <br /> (where applicable) in good working condition? <br /> 6 For double-wall tanks or double bottom tanks or CE-ASTs,is interstice free of liquid? <br /> Remove the liquid if it is found. If tank product is found,investigate possible leak. ❑Yes ❑ No ❑ N/A <br /> Equipment on tank - <br /> 7 If overfill equipment has a"test"button,does it activate the audible horn or light ❑Yes ii NO ❑ N/A -- <br /> to confirm operation?If battery operated, replace battery if needed. <br /> 8 Is overfill prevention equipment in goodworking condition?If it is equipped with ❑Yes ❑ NO ii N/A - - <br /> mechanical test mechanism,actuate the mechanism to confirm operation. <br /> 9 Is the spill container(spill bucket)empty,free of visible leaks and in good working <br /> condition? ❑Yes ❑ No ❑ N/A <br /> 10 Are piping connections to the tank(valves,fittings,pumps,etc.)free of visible leaks? <br /> Note.If"No", identify locaffon and describe leak. ❑Yes ❑ No <br /> 11 Do the ladders/platforms/walkways appear to be secure with no sign of severe corrosion ❑ Yes ❑ No ❑ N/A <br /> or damage? - .. <br /> Containment(Dikingllmpounding) <br /> 12 Is the containment free of excess liquid,debris,cracks,corrosion,erosion,fire hazards and ❑Yes ❑ NO ❑ N/A <br /> other integrity issues? <br /> 13 Are dike drain valves closed and in good working condition? ❑Yes ❑ No ❑ N/A <br /> 14 Are containment egress pathways clear and any gates/doors operable? ❑Yes ❑ No ❑ N/A <br /> Concrete Exterior AST(CE-AST) <br /> 15 Inspect all sides for cracks in concrete. Are there any cracks in the concrete exterior larger ❑YeS ❑ NO ❑ N/A <br /> than 1/16"? <br /> 16 Inspect concrete exterior body of the tank for cleanliness,need of coating,or rusting where ❑Yes ❑ NO ❑ N/A <br /> applicable. Tank exterior in acceptable condition? <br /> Visual inspect all tank top openings including nipples, manways,tank top overfill containers, <br /> 17 and leak detection tubes. Is the sealant between all tank top openings and concrete intact ❑ Yes ❑ No ❑ N/A <br /> and in good condition? <br /> Other Conditions <br /> 18 Is the system free of any other conditions that need to beaddressedfor ❑ YeS ❑ NO <br /> continued safe operation? <br /> Monthly Checklist Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.