My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
7707
>
2800 - Aboveground Petroleum Storage Program
>
PR0538333
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 8:40:57 AM
Creation date
4/7/2020 3:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0538333
PE
2832
FACILITY_ID
FA0021992
FACILITY_NAME
CDCR-California Health Care Facility
STREET_NUMBER
7707
STREET_NAME
AUSTIN
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
181-100-11
CURRENT_STATUS
01
SITE_LOCATION
7707 Austin Rd
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations <br /> that have not been addressed for CDCR-California Health Care Facility as of July <br /> 02, 2020. <br /> Open violations from January 10, 2019 inspection <br /> Violation#301-Failed to amend Plan as necessary. <br /> The SPCC plan does not address six generators that each have a capacity of storing 105 gallons of oil for <br /> lubrication. The SPCC plan does not address the permanently manifolded tanks. The Spill Prevention, <br /> Control, and Countermeasure(SPCC) Plan must be amended when there is a change in the facility design, <br /> construction, operation, or maintenance that materially affects its potential for a discharge, within 6 months <br /> of the change, and implemented as soon as possible, not later than 6 months following preparation of the <br /> amendment. Immediately make all necessary amendments to the SPCC Plan to accurately represent the <br /> procedures and policies currently in place at the facility. <br /> Note: Permanently manifolded tanks are tanks that are designed, installed, or operated in such a manner that <br /> the multiple containers function as a single storage unit(67 FR 47122, July 17, 2002).Accordingly, the total <br /> capacity of manifolded containers is the design capacity standard for the sized secondary containment <br /> provisions(plus freeboard in certain cases). <br /> M This violation was corrected ❑ This violation will be corrected by(date) <br /> X Supporting documents included <br /> Describe actions taken or will be taken to correct violation SPCC Plan amended as necessary to address the <br /> 105 gallons of oil contained in the six (6) on-site generators. SPCC Plan has been reviewed, <br /> approved and certified by Karman Sepehri, Registered Professional Engineer. <br /> Violation#710- Plan failed to adequately discuss procedures to test or inspect each container for <br /> integrity. <br /> The SPCC plan does not reference an industry standard for inspections/tests of the tanks. Qualifications of <br /> personnel performing tests and inspections, frequency and type of testing and inspections for formal <br /> inspections ,if required by an industry standard, are not addressed in the plan. Each aboveground container <br /> shall be tested and inspected for integrity on a regular schedule and whenever repairs are made. The <br /> qualifications of personnel performing tests and inspections, frequency and type of testing and inspections <br /> that take into account container size, configuration, and design shall be determined in accordance with <br /> industry standards. Examples of these integrity tests include, but are not limited to: visual inspection, <br /> hydrostatic testing, radiographic testing, ultrasonic testing, acoustic emissions testing, or other systems of <br /> non-destructive testing. Comparison records and other records of inspections and tests must be maintained <br /> on site. <br /> amendj th eSPCC plan to include discussion of industry standards , or provide equivalence as allowed by <br /> CFR 112.7(a)(2). <br /> IX This violation was corrected ❑ This violation will be corrected by(date) <br /> M Supporting documents included <br /> Describe actions taken or will be taken to correct violation SPCC Plan amended as necessary to address the <br /> procedures to test or inspect each container for integrity. SPCC Plan has been reviewed , <br /> approved and certified by Karman Sepehri, Registered Professional Engineer. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.