Laserfiche WebLink
State of California Department of Corrections and Rehabilitation <br /> Memorandum <br /> Date JAN 16 2020 <br /> To Laura Eldridge <br /> Warden (A) <br /> California Health Care Facility <br /> i <br /> Subject: CALIFORNIA HEALTH CARE FACILITY (CHCF) — SPILL PREVENTION <br /> CONTROL AND COUNTERMEASURE (SPCC) PLAN <br /> This is a response to your Service Request, dated July 24, 2019, requesting an assessment of <br /> the Spill Prevention Control and Countermeasure (SPCC)Plan. A site visit was conducted by <br /> Tai Nguyen, Civil Engineer, Design Services, on December 27, 2019. Based on the site <br /> investigation and discussion with Anthony Wilson, Chief Engineer, CHCF, we feel that the <br /> SPCC Plan for CHCF has been prepared with good engineering practices and is hereby certified. <br /> If you have any questions,please call Tai Nguyen at(916) 255-3059. <br /> CHARD L. TRAVE I <br /> Chief, Principal Architect <br /> Design Services Section <br /> Attachment: CHCF 19AE2851 Service Request <br /> Spill Prevention Control and Countermeasure Plan Certification <br /> cc: Gary Ayers, Chief Engineer, CHCF <br /> Philip Albee, Correctional Plant Manager II, CHCF <br /> CDCR-FPCM-FAMB-AE PROJECTS <br /> CDCR-FPCM-DESS-DSS-AE PROJECTS <br /> CDCR-FPCM-CPPSB-AE PROJECTS <br /> CDCR-FPCM-CSB-AE PROJECTS <br /> Michael Beaber, Associate Director(A), DESS <br /> Richard Traversi (19AE2851) <br /> Tai Nguyen <br /> Plan Room Manager, Design Services <br /> P:\DESIGN SERVICES\CHCF\SR\19AE2851 SPCC Plan\Documents\CHCF 19AE2851 Service Request Response <br /> f CDC 1617(3/89) <br />