Laserfiche WebLink
' CONTENTS <br /> 1 INTRODUCTION <br /> ' 1 1 Work to Date 1- 1 <br /> 12 Site Contamination 1- 2 <br /> 1 3 Agency Discussions 1- 3 <br /> 14 Remediation Plan Development 1- 3 <br /> ' 2 BACKGROUND <br /> 21 General Area Conditions 2- 1 <br /> ' <br /> 21 1 Site History -Plant Site 2- 1 <br /> 2 1 2 Preliminary Investigation & Evaluation Report - Plant Site 2- 2 <br /> 21 3 Review of Earlier Study 2- 2 <br /> ' 2 1 4 Preliminary Finding-Acampo Plant Site 2- 3 <br /> ' 3 SCOPE OF WORK <br /> 31 Characterize Soil Contamination 3- 1 <br /> 31 1 Site Specific Soil Sampling 3- 1 <br /> 32 Characterize Intercepted Water 3- 2 <br /> 3 2 1 Site Specific Groundwater Sampling 3- 2 <br /> ' 33 Monitoring Well Installation and Sampling 3- 2 <br /> 3 3 1 Site Specific Monitoring Well Construction 3- 2 <br /> ' 332 Site Specific Monitoring Well Sampling 3- 3 <br /> ' 4 PROJECT CONTROLS <br /> 41 Health and Safety Plan 4- 1 <br /> ' <br /> 42 Work Schedule 4- 1 <br /> 43 Budget and Cost Controls 4- 2 <br /> 44 Remediation Goals 4- 2 <br /> 45 Additional Permits 4- 2 <br /> 46 Final report 4- 2 <br /> 1 <br />