Laserfiche WebLink
flowing or heaving sands This bind- <br /> ing can generally be overcome by Geoprobe Madel GS1000 <br /> ' lowering extension rods down the Grout Machine <br /> inside of the well user and gently, Plastic Plug <br /> but firmly, tapping the extension (13227) <br /> rods against the base of the well as <br /> the rods are slowly retracted If the <br /> binding persists, clean tap water or t <br /> distilled water may be poured down <br /> ' the annulus of the rods to increase 1)Fill Probe Rads oath <br /> the hydraulic head inside the well grout from bottom up <br /> This step,combined with the use of 2)continue operating Grout <br /> extension rods, will free up the Pump while retracting rods <br /> prepacked screen and allow for <br /> proper screen placement <br /> Side-Port Tremie Tube <br /> Once the well is set, conventional High Solids (Flexible Tubing 14299} <br /> Bentonite Slurry <br /> flush-mounted or aboveground well or Neat Cement Grout <br /> protection can be installed to prevent Bentonite Seat <br /> ' tampering or damage to the well <br /> head (Fig 2 2) Prepack screen Grout Barrier <br /> monitoring wells can be sampled by <br /> ' several available methods(peristal- <br /> tic pump, mini-bailer, Geoprobe's <br /> tubing check valve, etc) to obtain <br /> high integrity water quality samples <br /> These wells also provide accurate <br /> water level measurements and can <br /> ' be used as observation wells during <br /> aquifer pump tests Additionally, FIGURE 2 3 <br /> commercially available interface Grouting Well Annulus with <br /> probes can be used to detect and Geoprobe Grout Machine <br /> measure the thickness of free prod- <br /> uct(LNAPL and DNAPL)inside the <br /> wells <br /> When installed properly,these small diameter wells generally meet regulatory requirements for a perma- <br /> nent monitoring well While a detailed installation procedure is given in this document,it is by no means <br /> ' totally inclusive Always check local regulatory requirements and modify the procedure accordingly <br /> Standard Operating Procedure Page 5 1 Qin x 2 5-in OD Prepack Screen Monitoring Well <br />