Laserfiche WebLink
a) Measured depth is 2 to 3 feet (0,6 to 0,9 m) <br /> less than riser length- This indicates that unstable Extension Rod Handle <br /> conditions have resulted in formation collapse A (AT69) <br /> natural grout barrier was formed as material col- Extension Rod <br /> (AT67 or AT671) <br /> lapsed around the PVC riser when the probe rods <br /> were retracted This commonly occurs in sandy <br /> formations No further action is required Proceed <br /> with Section 5 5 and perform Step 2 (unstable for- <br /> mation) <br /> ' b) Measured depth is equal to or greater than <br /> riser length: This indicates that stable conditions <br /> ' are present The probe hole has remained open and <br /> void space exists between the riser (and possibly <br /> the screen)and formation material Clean sand must t <br /> be placed downhole to provide a suitable grout bar- <br /> ner Continue with Step 2 <br /> 2 Begin slowly pouring 20140 grade sand down the <br /> ' annulus between the PVC riser and probe rod string <br /> Reduce spillage by using a funnel or flexible con- <br /> tamer as shown in Figure 5 10 Add approximately <br /> ' l 3 gal (5,0 L)for each 5-foot(1,52 m)screen sec- <br /> tion,plus 0 9 gal (3,4 L) for a 2-foot(0,6 m)layer <br /> of sand above the screen section <br /> 3 Measure the annulus depth after each 1,5 liters of <br /> sand The sand may not fall all the way past the <br /> screen due to the tight annulus and possible water <br /> Extension Rod <br /> intrusion This is acceptable, however, since the (AT67 or AT671) <br /> prepacked screens do not require the addition of screen push Adapter <br /> sand The important thing is that a sand barrier is (Gw1535) <br /> provided above the screens <br /> 4 Sand may also bridge within the annulus between <br /> the risers and probe rods and consequently fail to <br /> reach total depth(Fig 5 10) This most likely oc- FIGURE 5 9 <br /> curs when the sand contacts the water table during Using Extension Rods to <br /> ' deep well installations Wet probe rods also con- tap Out Wedged Screens <br /> tribute to sand bridging If the annulus is open, <br /> skip to Section 5 5, Step 1 if bridging is evident, <br /> t continue with Step 5 <br /> 5 In case of a sand bridge above the screens(wet rods,high water table,etc ),insert clean extension rods <br /> into the well annulus to break up the sand (Fig 5 10) Simultaneously retracting the probe rods <br /> ' usually helps Check annulus depth again If sand is no longer bridged,proceed to Section 5 5 if <br /> bridging is still evident,continue with Step 6 <br /> ' 6 If the sand bridge cannot be broken up with extension rods,inject a small amount of clean water into <br /> the annulus using a Geoprobe GS500 or GS1000 Grout Machine and 318-in (9,5mm)OD polycthy- <br /> ' Standard Operating Procedure Page 16 1 0 in x 2 5 in OD Prepack Screen Monitoring Well <br />