My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005448
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:27 PM
Creation date
4/8/2020 2:37:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005448
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE- Slide the probe rods over <br /> the tremae tube and place neatly on Geoprobe Grout Machine <br /> the ground next to the grout machine (Gs1000) <br /> Be careful to not pinch or bind the Plastic Plug <br /> flexible tubing as this forms weak (13227) <br /> spots which may burst when pressure <br /> ' is applied <br /> NOTE Try to avoid filling the up- <br /> per I2 inches (305 mm)of well an- 1 Fill Probe Rods <br /> nulus with grout when pulling the ex- with g!Fut from <br /> bottom up <br /> pendable point holder This will 2 continue <br /> make for a cleaner well cap installa- operating grout <br /> tion machine while <br /> withdrawing rods <br /> 6 When all probe rods have been <br /> retrieved and the well is adequately Tremie Tube <br /> High solids (Flexible Tubing, <br /> grouted,unstring the tremie tube and Bentonite slurry 14299) <br /> begin cleanup It is important to forms well seal <br /> promptly clean the probe rods,grout <br /> Bentonite seal <br /> machine, and accessories This is <br /> especially true of cement mixes as <br /> t they quickly set up and are difficult Grout Barrier <br /> to remove once dried <br /> 57 Surface Cover/Well Protection <br /> A surface cover protects the PVC <br /> well riser from damage and tamper- <br /> ing Although aboveground and <br /> flush-mount well covers may be used, <br /> most Geoprobe monitoring wells FIGURE 512 <br /> have been installed with flush-mount Grouting Well Annulus with <br /> covers (.Fig 5 13) Consult the Geoprobe GS1000 Grout Machine <br /> project planners and/or appropriate <br /> regulators to determine the approved <br /> well cover configuration for your specific application <br /> 1 In order to fit under a flush-mount cover,the top of the well riser must be below the ground surface <br /> Place the well cover over the riser and push it into the ground to mark the cover diameter Remove the <br /> cover and dig out approximately 6 inches(l 52 mm)of soil from within the cover mark <br /> 2 Remove the plug from the I 0-inch PVC riser The top of the riser should be approximately 2 inches <br /> (51 mm)above the bottom of the hole If a joint is near this level,unthread the top vscr if a joint is not <br /> positioned near the specified level, cut off the riser with PVC cutters Cut at a slight angle to make it <br /> ' easier to remove the plug Place a plug(13227)in the well riser Do not apply duct tape at this time <br /> NOTE Do not cut off the riser with a hacksaw as cuttings will fall down into the screens <br /> r <br /> • <br /> Standard Operating Procedure Page 20 1 0-m x 2 5 in OD Prepack Screen Monitoring Well <br />
The URL can be used to link to this page
Your browser does not support the video tag.