Laserfiche WebLink
I INTRODUCTION CONTENTS <br /> 11 Work to Date 1- 1 <br /> 12 Site Contamination 1- 2 <br /> 13 Agency Discussions 1- 3 <br /> 14 Remediation Pian Development 1- 4 <br /> i2 BACKGROUND <br /> 21 General Area Conditions 2- 1 <br /> 2 1 1 Site History -Plant Site 2- 1 <br /> 21 2 Preliminary Investigation & Evaluation Report - Plant Site 2- 2 <br /> 21 3 Review of Studies 2- 2 <br /> i <br /> 3 SCOPE OF WORK <br /> 31 Characterize Soil Contamination 3- 1 <br /> 3 1 1 Site Specific Soil Sampling 3- 1 <br /> 32 Characterize Intercepted Water 3_ 1 <br /> 3 2 1 Monitoring Well Installation and 3- 1 <br /> 33 Proposed Immediate Work 3- 2 <br /> 34 Other Activities 3- 2 <br /> 4 PROJECT CONTROLS <br /> 41 Health and Safety Plan 4- 1 <br /> ' <br /> 42 Work Schedule 4- 1 <br /> 43 Budget and Cost Controls <br /> 4- 2 <br /> 44 Remediation Goals 4- 2 <br /> 45 Additional Permits 4- 2 <br /> 46 Final report 4- 2 <br />