Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD LOG 2003 <br /> ' SAMPLE L®CATION/MVI'- i BATE: 9/23/2003 <br /> ' PROJECT NAME WESTERN OIL T SPREADING ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS HWY 99 FRONTAGE ROAD SAMPLE TBIE <br /> ' CITY STATE LODI,CA SAMPLE CONTAINERS 2 VOA'S/1 LITER SITE CONTACT PRESERVATIVES HCL <br /> CONSULTANT. D K BARBER&ASSOC LAB ANALYSIS BY SEQUOIA LAB/SAC <br /> ' PROJECT MANAGER DAN BARBER MONUMENT FLUSH <br /> SAMPLER . DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED WELL CASING DIA 2" / 01632 <br /> ' SAMPLE MEDIA- GROUNDWATER P I D READING I ODOR NIA FUEL <br /> TOP OF CASING ELEY ION 5754 MSL COLOR BROWN <br /> DEPTH TO WATER feet 100th's 5275 FEET CALC PURGE VOL 070 GAL <br /> ' DEPTH OF WELL (feet 100th's) 5705 FEET TOTAL VOLUME PURGED 3 GAL <br /> STANDING WATER COLUMN 430 FEET DEPTH OF PUMP NIA FEET <br /> FIELD PARAMETERS <br /> ' TIME CUMULATIVE DRAW PUMPING :pH E C TEMP OR P DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLORPERPURGE TW) (GPM/MM (USMHOS) (CcM—) (Mvvlts) (PPM} (N T U) <br /> 0 N/A 2 GPM 702 11.50 22 35 053 BROWN <br /> 1 703 1141 215 35 .0.70 " <br /> ' 2 „ ;; 700 1137 213 37 052 <br /> 3 700 1133 212 35 050 <br /> ' AVERAGE 7 01 1140 25 21 5 355 <br /> PURGE METHOD DEDICATED WATERRA INERTIA PUMP <br /> ' SAMPLE METHOD DEDICATED WATERRA INERTIA PUMP <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 55 23' <br /> WELL INTEGRITY SECURE WI NEW CAP&LOCK <br /> WELL LOCATION SEE SITS MAP <br /> ' REMARKS <br /> WEATHER CLEAR SKIES WIND NW 5 MPH <br /> QUALITY CONTROL- ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITHA STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D O T 17 55 GAL STEEL DRUM OR 60 GAL POLY DRUM <br /> ' INSTRUMENTATION Y S 1556 MULTIPROBE SYSTEM Y S I DISSOLVED OXYGEN METER <br /> SOLIN=SLOPE MTrER TIIERMODINE 5808 P 1 D <br /> KECK INTERFACE METER TURBIDITY METER <br /> Lak #OF DRUMS ON SIGHT WATER 2 SOII, 0 <br />