My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005460
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:27 PM
Creation date
4/8/2020 2:54:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005460
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> �k Stellar Environmental Solutions, Inc. 2198 Sixth Street,Berkeley,CA 94710 <br /> Tel (510)644-3123•Fax (510)644-3859 <br /> Geoscience& Engineering Consulting <br /> ' June 19, 2002 <br /> Mr Daniel K Barber <br /> D K Barber& Associates <br /> 623 Camilla Way <br /> Lodi, California 55242 <br /> INTRODUCTION& SUMMARY OF FIELDWORK <br /> Stellar Environmental Solutions (SES) completed exploratory borehole and well <br /> installation field work for D K Barber & Associates, providing geologic support at the <br /> "Tank Farm" investigation project site located at comer of Woodbridge Road and <br /> Highway 99 in the city of Lodi California The fieldwork occurred on June 5, 6 and 7, <br /> 2002 The scope of the work implemented by SES for D K Barber & Associates <br /> included <br /> ❑ Review of the May 2002 workplan submitted to the regultors <br /> ❑ Geologist of record services during the filedwork as provided by SES geologist, <br /> ' Mr Fred Hayden, R G <br /> ❑ Geologic support in the drilling 2 exploratory boreholes and seven groundater <br /> ' wells <br /> ❑ Collecting of soil samples for laboratory analysis and screening soil samples for <br /> ' contamination <br /> ❑ Preparing geologic logs for all boreholes and wells, and <br /> ❑ Completiion of this field work writeup <br /> D K Barber & Associates was responsible for determining sample locations, depths and <br /> analytical methods, obtaining permits, utility clearances, coring concrete floor at drilling <br /> • locations, managing investigation-derived waste, and all regulatory agency notifications <br /> and liaison <br /> Stellar Environmental Solutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.