My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005464
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
4/8/2020 2:56:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005464
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 3 SCOPE OF WORK <br /> 1 <br /> ' Western Oil & Spreading Inc proposes the following tasks leading to closure of the <br /> contaminated site <br /> (1) Characterize contaminated soil zone <br /> (2) Characterize the shallow groundwater zone and any contamination <br /> (3) Evaluate applicability and necessity of various remediation schemes <br /> ' (4) Carry out remediation or leave in place options <br /> (5) Apply for and achieve closure status of the site <br /> ' 31 Charactenze Soil Contamination Zone <br /> ' Exploratory borings utilizing either a continuous flight , hollow-stem auger drilling equipment <br /> or Direct Push Technology (DPT) such as a Geoprobe® may be utilized Both methods are <br /> briefly described in Appendix B, EXPLORATORY BORING AND WELL INSTALLATION <br /> PROCEDURES Cost, speed and flexibility in the field favor DPT A Model 5600 <br /> Geoprobe®, Heavy Truck Mounted Probe is planned to be employed This size and type of <br /> ' unit has achieved penetration to depths greater than 100 feet in similar formations The <br /> groundwater surface is thought to be 50 to 60 feet bgs <br /> 31.1 Site Specific Soil Sampling <br /> P 9 <br /> ' Site specific boring directions are also included in Appendix B Location of initial boreholes <br /> is described in the Figure 3, Site Plan Hopefully, three DPT borings will allow definition of <br /> the petroleum hydrocarbon contaminated mass limits In the event the three are not <br /> r' sufficient, additional borings will be placed at the discretion of the Project Manager or <br /> delegated responsible professional In the event additional holes are required beyond the <br /> ' site's boundary (parcel boundary), additional holes may be bored with consent of the <br /> receiving landowner and with well drilling permitting from San Joaquin County PHSIEHD <br /> ' Lithological recording, leading to a presentation depictingthe cross section of each hole, <br /> , <br /> t will be performed as sampling is performed <br /> 3-1 <br /> 1 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.