Laserfiche WebLink
5 Remove the drive cap from the expendable point holder Install an O-ring on the point holder in the <br /> groove located at the base of the male threads(Fig 5 2) <br /> ' IMPORTANT: O-rings must be used to seal the 3 25-inch Probe Rod joints <br /> NOTE Make sure the O-ring groove and O-ring mating surface are clean. Any foreign material located <br /> ' in these areas will prevent the O-ring from sealing properly <br /> 6 Lubricate the O-nng and O-ring mating surface(Fig 5 3)with a small amount of clean water Apply <br /> ' the water with either a moist cloth or a spray bottle <br /> 7 Thread a 3 25-mch Probe Rod onto the expendable point <br /> ' 8 Place the drive cap on the probe rod and advance the rod string <br /> O-Ring Groove <br /> O-ring <br /> 3 25-in Probe Mating <br /> Rod or Surface <br /> ' Expendable Point <br /> Holder ;. O-Ring <br /> (9960) <br /> FIGURE 5 2 FIGURE 5 3 <br /> Probe Rod O-Ring Groove Lubricating O-Ring and Mating Surface <br /> 9 Remove the drive cap Again,install an 0-ring in the probe rod's O-ring groove Lubncate the O-nng <br /> and the 0-ring mating surface(Fig 5 3) Add the next probe rod,replace the drive cap,and advance <br /> ' the rod string <br /> 10 Repeat Step 8 until the leading end of the rod string is 1 5 inches (3 8 cm) below the bottom of the <br /> ' desired screen interval The additional depth adjusts for the extra height created by the expendable <br /> point and the PVC Bottom Plug The top probe rod must also extend at least 15 inches 138 cm)above <br /> the ground surface to allow room for the rod grip puller used later in this procedure (An additional <br /> rod may be added if necessary) Move the probe foot back to provide access to the top of the rod <br /> string <br /> 53 Deploying the screen and riser pipe <br /> 1 With the probe rods driven to the proper depth, the next step is to deploy the screen and riser pipe <br /> Inspect the 1 0-m x 2 5-in OD Prepack Screen(s)to make sure that <br /> a) the plastic plug is removed <br /> b) the stainless steel screws are snug (See Fig 5 4) <br /> ' standard Operating Procedure Page 12 1 Qin x 2 S in OD Prepack Screen Monitoring Well <br /> 1 <br />