My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005464
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
4/8/2020 2:56:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005464
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Caution. Be careful when"kneading"the screen Sudden screen slippage can pinch hands between the screen <br /> and the probe rod To prevent screen slippage, have an assistant hold onto the prepack during the <br /> ' "kneading"operation <br /> 4 Add additional five-foot prepacks to obtain the desired screened interval 0-rings can be installed <br /> between the prepack sections if desired <br /> ' 5 With the assistance of second person,attach five- <br /> foot sections of l 0-inch Schedule 40 PVC Riser <br /> to the top of the screen assembly O-nngsare re- Plastic Plug <br /> quired at each riser joint to prevent groundwater, (13227) <br /> located above the desired monitoring interval, <br /> from seeping into the well Continue to add riser 1 0-in Sch 40 PVC <br /> sections until the assembly reaches the bottom of (11�2876�� <br /> the probe rods (Fig 5 7) At least one foot (0 3 <br /> m) of riser should extend past the top probe rod <br /> Place the plastic plug into the top riser Duct tape <br /> may be used to help keep the plug in the riser <br /> 6 It is now time to pull up the probe rods from around <br /> the well screen and riser Reposition the probe <br /> unit so that the Rod Grip Puller can be attached to <br /> the rod string <br /> 7 Retract the rod string the total length of all the <br /> screens plus an additional 3 feet (1 m) While <br /> pulling the rods, observe whether the top PVC 1 0-m x 2 5-m OD <br /> riser stays in place or moves up with the rods Prepack Screen <br /> (11679) <br /> ~L <br /> a) if the riser stays in place,stable formation con- <br /> ditions.are present Continue retracting the rods <br /> to the depth specified above Go to Section 4 4 ~� <br /> b) if the riser moves up with the probe rods,have <br /> a second person hold it in place while pulling up 1 0-1n x 2 5 in OD <br /> the rods An additional section of PVC riser may 4: ~ Prepack Screen <br /> ' be helpful Once the probe rods have cleared the =`> (11679) <br /> L� <br /> lower section of screen, the screen and riser as- <br /> sembly should stop rising with the rods Con- <br /> tinue retracting to the depth specified above Go <br /> to Section 5 4 <br /> c~' <br /> c) if the risers continue to move up with the probe L'n PVC Bottom Plug <br /> rods and cannot be held in place by hand, sand (12881) <br /> heave has most likely caused the screen to bind to Expendable Pant <br /> the inside of the rods Extension rods are now 3 6-in OD <br /> ' required (Refer to Figure 5 8 for an illustration (AT3215) <br /> of extension rod accessories) <br /> FIGURE 5 7 <br /> Prepack Assembly Inside Probe Rods <br /> Standard Operating Procedure Page 14 1 Qin x 2 5-in OD Prepack Screen Monitoring Well <br />
The URL can be used to link to this page
Your browser does not support the video tag.