Laserfiche WebLink
1 <br /> lene tubing Simply insert the poly <br /> tubing down the well annulus until the <br /> ' sand bridge is contacted Attach the Plastic Plug <br /> tubing to the grout machine and pump (13227) <br /> up to one gallon of clean water while <br /> moving the tubing up and down The <br /> betting action of the water will loosen <br /> and remove the sand bridge Check n- 2 <br /> the annulus depth again The distanceJE�xtensionRods <br /> ' should be 2 to 3 feet (0,6 to 0,9 m) <br /> less than the riser length Proceed <br /> with Section 5 5 } <br /> 55 Bentonite Seal Above Screen <br /> Bentonite is an expanding clay whichexhibits very low permeability When <br /> properly placed,bentonite prevents con-tanimants from moving into the well <br /> screens from above the desired monitor- <br /> ing interval The seal is formed either <br /> by pouring granular bentonite into the — Probe Rod string <br /> ' annulus from the ground surface, or by Void space screenwithdrawn 3-ft above <br /> r screen <br /> infecting a high-solids bentorute slurry resulting from j <br /> directly above the grout barrier The use stable formation <br /> (Must fill with sand placed above <br /> of granular bentonite is limited to cases sand from screen to provide <br /> in which the top of the screen ends above surface) grout barrier <br /> the water table(no water is present in the <br /> probe rods) Whichever method is used, <br /> at least 2 feet(0,6 m) of bentonite must <br /> be placed above the sand pack <br /> ' 1. Stable Formation. Granular bento- <br /> nite is recommended if the following <br /> conditions are met <br /> • Top of screen interval is above the FIGURE 5 10 <br /> water table Installing Grout Barrier from Ground Surface <br /> Formation remained open when with 20/40 Grade Sand <br /> probe rods were retracted <br /> • Bridging was not encountered while <br /> installing sand for the grout barner in Section 5 4 <br /> ' a) Withdraw the probe rod string another 3 to 4 feet(0,9 to i m)and ensure that the PVC riser does <br /> not lift with the rods it is important that the bottom of the rod string is above the proposed seal <br /> interval If positioned too low, dry bentonite will backup into the expendable point holder Bridging <br /> ' then results if moisture is present inside the probe rods <br /> b) Pour bentonite between the probe rods and PVC riser as was done with the sand in Section 5 4 To <br /> properly hydrate the granular bentonite,it is necessary to penodicaliy add water through a tremie tube <br /> while installing the bentonite To accomplish this, repeat adding six inches of granular bentonite <br /> Standard Operating Procedure Page 17 1 0-in x 2 5-in OD Prepack Screen Monitoring Well <br /> FIGURE 4 6 <br /> ' Screen Deployment Using a Casing Pull Kit <br />