Laserfiche WebLink
A <br /> • <br /> Gillies Trucking <br /> Remediation Plan <br /> Page 2 <br /> When the dirt is certified Mean by lab analysis, it will be <br /> placed back in the excavation of hauled off as fill dirt . <br /> In regards to the existing contaminated sol on site, this <br /> will also be bio-remediated with the same culture as the soil <br /> from re-excavation, but this phase will start as soon as <br /> possible upon receipt of the appropriate permits. <br /> The time schedule is; <br /> Activity Da s Testing <br /> Re--excavation 2 Sample Lab Analysis <br /> Bio Innoculation g <br /> Blo Growth 14 Sample Lab Analysis <br /> Bio Remediation <br /> Complete 90 Sample Lab Analysis <br /> ----------- <br /> Total 111 <br /> Actual dates will depend upon date of approval . If you have <br /> any questions please call <br /> Sincerely, <br /> Dave McCain <br /> klm <br /> Enclosed <br />