Laserfiche WebLink
NOTLc—& OEM <br /> HIDDEN'LINES DENOTE THE ITEMS TO BE REMOVED <br /> (U,N,O,' <br /> p <br /> HMRA' IIL�. l <br /> 7 E <br /> TYP, <br /> 'I <br /> 2l',0 21st Streef <br /> 9�8_1 <br /> 7 272 <br /> L <br /> G.C.TO PATCH&REPAIR-7 <br /> iii Q3 AS REQ'D. <br /> CONDIMENT COUNTER <br /> TO REMAINagaaoaaaa <br /> '5" <br /> 0& <br /> Q, <br /> No. <br /> 7­1Z 24706 <br /> REN. 12/31/17 Z <br /> 0 <br /> 0 <br /> 00 <br /> .0 <br /> 0100000.0 <br /> F <br /> B <br /> REMOVE(E),COMPARTMENT SINK <br /> AND(E)HAND SINK, CAP UTILITIES <br /> AS NEEDED <br /> IR <br /> NOB HILL <br /> NORTH 000 -40 <br /> '114 <br /> SCALE: I/4"=j'-0" A <br /> SOLID CORE WD,DOOR, 500 WEST CAPITOL AVENUE <br /> NOTES: SEE SCHEDULE W. SACRAMENTO, CA 95&)5 <br /> I 7C SIM, P.O. BOX 15618 <br /> SEE SPECIFICATIONS FOR DOOR 4. EXIT DOORS ARE OPENABLE FROM THE 11,1 <br /> MTL.STUDS 71P, <br /> HARDWARE DESIGNATIONS INSIDE WITHOUT THE USE OF A KEY, WALLFINISH VERIFY W1 SACRAMENTO, CA 95852 <br /> SPECIAL KNOWLEDGE OR EFFECT <br /> 2, PAINT DOOR&FRAMES, VERIFY I RALEY'S PROJECT MGR, <br /> W/RALEY'S PROJECT MGR, 5- DOOR OPENING EFFORT: 5/8"TYPE'X'GYP.BID, <br /> 5 LBS.MAX.@ EXTERIOR DOORS I ON BOTH SIDES-PAINT <br /> 1 G.C.TO VERIFY LOCATION OF ALL 5 LBS.MAX.@c)INTERIOR DOORS _j <br /> 1 11 <br /> TEMPERED GLASS. FOR COMPLIANCE 105 LBS,MAX. @FIRE DOORS ALONG <br /> WITH 2016 CBC SECT.2406 P.O.T,(PER 2016 CBC 11 B-40429) <br /> DOOR NUMBER 7C <br /> HARDWARE GROUP, SEE <br /> SPECIFICATIONS FOR <br /> DESCRIPTION <br /> /8—A\ T-0'x T-0'x 13/4"SOLID CORE WD.DOOR <br /> W/BIRCH VENEER IN PRESSED METAL <br /> FRAME, FINISH TO MATCH(E) R-13 SOUND INSULAT!ON <br /> 2x STUD WALL TYP, <br /> P,M,FRAMETYP. <br /> DOOR SCHEDULE <br /> 5c SCALE: 1/4"=V-0" <br /> 1"MIN.OFFSET LAP <br /> FIELD DRILL&INSTALL POP <br /> RIVETS AS NECESSARY TO <br /> OBT AIN SMOOTH SURFACE, (E)CURTAIN WALL <br /> SPACE OPT PROJECT <br /> 18 Ga.GALV,SHEET MTL,CASE <br /> TO CEILING.PAINT AS DIRECTED SALES 1 #12 x l'S,M.S. <br /> mi <br /> RALEY'S/ <br /> RE":FRIG,OR SYRUP CONDUITS 1/2"ALUM,REVEAL <br /> 0 RUNNING VERTICAL ALONG FACE 1/2"MIN,DEFLECTION <br /> 771' <br /> OF TUBE STEEL <br /> U <br /> BEL AIR/ <br /> CASEWORK BEYOND <br /> 3 5/8'x 20 Ga.MTL,STUDS 20 Ga.CONT.SLOTTED DEEP <br /> NOB HILL/ <br /> IN' EG TRACK <br /> @16'0�C� <br /> STEEL TUBE COLUMN <br /> MINIMUM FOOD SOURCE <br /> AS OCCURING <br /> 5/8'GYP.BD,-PAINT CONT,22 Ga.TOP TRACK <br /> STORE <br /> ---------------------- <br /> I GENERAI NOTES: <br /> 1 GRIND EXPOSED EDGES SMOOTH,CORNERS TO BE 90'�ONLY ONE PIECE CONSTRUCTION # 306 <br /> 1 WILL BE ACCEPTED.COVER MAY BE CLAMPED TEMPORARILY FOR RIVETING,SEAM TO <br /> I FACE TOWARD PLAN NORTH,UNLESS DIRECTED OT HERWISE BY OWNER,ALL EDGES <br /> L.!HALL BE BENT AND RETURNED,NO SHARP EDGES SHALL BE ALLOWED. <br /> ------------------------- 4255 MORADA LANE <br /> STOCKTON CA 95212 <br /> m m m <br /> f—#4 x 12'REBAR DOWEL @ 24"O,C, <br /> GREASE END FOR(E"SLAB <br /> SUBMITTAL SET <br /> r—CONC,SLAB W/6x6/1.4x1,4 <br /> 0/2"SAND,'VAPOR 17 <br /> 518"GYP.BD. -PAINT 7-20 t <br /> BARRIER,4"GRAVEL&(E) <br /> ENGINEERED FILL <br /> DRILL 6"MIN.INTO(E)SLAB WALL FINISH VERIFY Al/ m m m <br /> TO RECEIVE GREASED RALEY'S PROJECTMGR. <br /> REBAR DOWEL 31,18"x 20 Ga,MTL STUDS <br /> TRENCH C6 16'O.C. <br /> (E)CONC_SLAB SALES <br /> I WIDTH <br /> EVISIONS <br /> Tli � RE <br /> I, 6'MIN. 6" 5"MIN, <br /> 7-1 <br /> PTI <br /> NO. DLESCRI 13ON <br /> CONT,20 Ga.SILL TRACK lly'; DATF <br /> 4"RUBBER BASE <br /> HILTI X-U(OR X-C)POWDER <br /> _77-11 <br /> DRIVEN FASTENERS @ 48'O,C, <br /> 4 <br /> EMBEDMENT <br /> MAX.W/3"MIN, <br /> T-fE­ CODING <br /> )FL <br /> D, <br /> ISI <br /> _5 <br /> REINSTALL VAPOR <br /> BARRIER TO PROVIDE <br /> MOISTURE SEAL <br /> P <br /> M-1 L<WALL <br /> STUDS <br /> ALL F_XW%S AND MT-,:-I\j vAjj-L--:A4 App_FMNG <br /> 20 Ga.STUD <br /> �FUN C0NSFlIu7tE <br /> COPE FLANGES CRIGN& & LWaj'S-6 <br /> �M CF FW ARNTECM AND vAy N�IT BE <br /> IlRjck_IE� USE) OF LlAl= Ifl-OiT <br /> WTI TFLEIN CONIH-VI T t-W A--YA- TIECC <br /> ENLARGE—D PLANS <br /> AND DETAILS <br /> \Zr <br /> SECURE W/(2)SCREWS <br /> @ EACH STUD NOVEMBER 17, 2017 <br /> 7=77 77 _7777 7 7 7 7 77 77 77 777 7 7 7 7 <br /> E�j QxT' ' <br /> Raeeqs <br /> IWA <br /> 1:4 <br /> DRAWN <br /> RL <br /> _cHECKEE BY; <br /> SID AlA <br /> 'OB­­N0, <br /> 17098 <br />