ABBREVIATION GENERAL NATES SCOPE ' <br /> O E OF WORK PROJECT CONTACTS SHEET INDEX <br /> .. <br /> A1C AIR CONDITIONING R RADIUS 1. GENERAL CONTRACTOR SHALL VISIT THE SITE, REVIEW THE BUILDING SHEET I SHEET TITLE 1 2 3 4 5 <br /> ACT ACOUSTICAL CEILING TILE REF REFERENCE SHELL DRAWINGS AS SUBMITTED BY THE LANDLORD OR STARBUCKS MINOR STORE RENOVATION. PAINT, ART, FURNITURE UPDATES, ADDITION <br /> ADJ ADJUSTABLE REQ'D REQUIRED SITE SURVEYOR AND BECOME THOROUGHLY FAMILIAR WITH THE SITE OF SINKS TO ENGINE. MAILING GENERAL <br /> AFF ABOVE FINISHED FLOOR REV REVISION CONDITIONS PRIOR TO BIDDING OR CONSTRUCTION. ADDRESS: STARBUCKS COFFEE COMPANY <br /> AMP AMPERE RND ROUND 2401 UTAH AVENUE SOUTH G-0001 GENERAL INFORMATION <br /> ARCH ARCHITECT 2. GENERAL CONTRACTOR SHALL CONSULT WITH STARBUCKS MS STOP: S-SDI0 <br /> SB STARBUCKS CONSTRUCTION MANAGER TO RESOLVE ANY CHANGES, OMISSIONS SEATTLE, WASHINGTON 98134 INTERIORS <br /> BOH BACK OF HOUSE SC SOLID CORE OR PLAN DISCREPANCIES PRIOR TO BIDDING OR CONSTRUCTION. PROJECT DATA (206) 318-1575 I-1101 DEMOLITION FLOOR PLAN <br /> SF SQUARE FEET PROGRAM I-1105 FF AND E PLAN <br /> GAB CABINET SHT SHEET 3. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH MANAGER: MICHAEL MONTENEGRO <br /> CL CENTER LINE SIM SIMILAR LOCAL, COUNTY, STATE AND FEDERAL CODES AND ORDINANCES. STARBUCKS COFFEE COMPANY f-1108 REFLECTED CEILING PLAN <br /> CLG CEILING SPEC SPECIFICATION 17700 NEWHOPE STREET, SUITE 20© I-111 Q FLOOR AND WALL FINISH PLAN <br /> CM STARBUCKS CONSTRUCTION SQ SQUARE 4. GENERAL CONTRACTOR SHALL VERIFYTHE LOCATION OF ALL TYPE OF USE: COFFEE SHOP FOUNTAIN VALLEY, FET, S8 1-2101 INTERIOR ELEVATIONS cO2of7STARBUCKS coFFsEconnPaNv <br /> MANAGER UTILITIES. (714)885-3934 PHONE 1-2102 INTERIOR ELEVATIONS <br /> CTR CENTER TEMP TEMPORARY TYPE OF CONSTRUCTION: TYPE V (714)424-1920 FAX 1-5001 DESIGN DETAILS- FRONTBAR <br /> CX COMMISSIONING TYP TYPICAL 5. GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING MMONTENEGRO@sTARBUCKS.COM STARBUCKS COFFEE <br /> CXA COMMISSIONING AGENT CLEARANCES REQUIRED BY OTHER TRADES AND NOTIFY STARBUCKS #OF STORIES: 1 DESIGN 1-5002 DESIGN DETAILS- BACKLINE +CASEWORK <br /> LINO UNLESS NOTED OTHERWISE CONSTRUCTION MANAGER OF ANY DISCREPANCIES PRIOR TO MANAGER: ONILEE ZABORNIAK 1-5003 DESIGN DETAILS-BANQUETTE COMPANY <br /> DEG DEGREE PROCEEDING WITH THE WORK. ALL DIMENSIONS ARE TO THE FACE BUILDING HEIGHT: +16'-3" STARBUCKS COFFEE COMPANY 1-5011 FLOOR FINISH AND CASEWORK DETAILS 2401 UTAH AVENUE SOUTH <br /> DET DETAIL VERT VERTICAL OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE. ALL 17700 NEWHOPE STREET, SUITE 200 I-5040 MERCH BAY DETAILS SEATTLE WASH/ <br /> DIA DIAMETER VIE VERIFY IN FIELD DIMENSIONS TO BETAKEN FROM DESIGNATED DATUM POINT. DO NOT SPRINKLERED: NO FOUNTAIN VALLEY, CA 92708 WASHINGTON 98134 <br /> DIM DIMENSION SCALE DRAWINGS. 1-6001 SCHEDULES <br /> (714)885-3994 PHONE 206) 318-1575 <br /> M STARBUCKS DESIGN MANAGER #OF EMPLOYEES/SHIFT: 4 {714)424-1920 FAX I-7001 EXISTING PHOTOS <br /> DN DOWN 6. GENERAL CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING OZABORNI@STARBUCKS.COM 1-7002 FINISHES THESE DRAWINGS AND SPECIFICATIONS ARE <br /> WALLS, FLOORS, CEILINGS, OR OTHER SURFACES IDENTIFIED TO TYPE OF OCCUPANCY: B 1-7003 INTERIOR PERSPECTIVE VIEWS CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> EA EACH REMAIN THAT MAY BECOME DAMAGED DURING THE COURSE OF THE CONSTRUCTION ALONSO MILLAN PROPERTY OF STARBUCKS CORPORATION, <br /> EL ELEVATION WORK. TOTAL GROSS S.F.: ±1,817 SF MANAGER: STARBUCKS COFFEE COMPANY WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> EQ EQUAL 17700 NEWHOPE STREET, SUITE 200 PLUMBING THIS WORK. THEY SHALL NOT BE <br /> EXIST EXISTING 7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING TOTAL INTERIOR SEATING: FOUNTAIN VALLEY, CA 92708 P-0001 PLUMBING SYMBOLS, LIST,AND ABBREVIATIONS REPRODUCED (IN WHOLE OR IN PART), SHARED <br /> 17 EXT EXTERIOR PERMITS FOR FIRE PROTECTION, PLUMBING, MECHANICAL, AND PROPOSED INT. SEATING: 36 SEATS/ 15 TABLES (714) 885-3995 PHONE P-0002 PLUMBING OUTLINE SPECIFICATION WITH THIRD PARTIES OR USED IN ANY MANNER <br /> ELECTRICAL SYSTEMS PRIOR TO INSTALLATION OF SUCH SYSTEMS. ON OTHER PROJECTS OR EXTENSIONS TO THIS <br /> c� FF&E FURNITURE, FIXTURE, AND (714)424-1920 FAX P-0003 PLUMBING OUTLINE SPECIFICATION, SCHEDULE, AND <br /> ADA SEATING AMILLAN@STAR BUCKS.COM CALCULATIONS PROJECT WITHOUT THE PRIOR WRITTEN <br /> � EQUIPMENT 8. GENERAL CONTRACTOR SHALL RETAIN ONE SET OF THE PLANS TO REQUIRED 36X5% = 2 CONSENT OF STARBUCKS CORPORATION, <br /> FLR FLOOR NOTE AND DOCUMENT ALL CHANGES DURING CONSTRUCTION. THIS PROPOSED ARCHITECT OF P-1101 PLUMBING FLOOR PLANS THESE DRAWINGS AND SPECIFICATIONS ARE <br /> 2 JOSE LAROCCA INTENDED TO EXPRESS DESIGN INTENT FOR A <br /> FT FOOT/FEET CLOSE-OUT PACKAGE"AS DESCRIBED IN THE CONSTRUCTION VALERIO ARCHITECTS PROTOTYPICAL STARBUCKS STORE (WHICH IS <br /> 5858 WILSHIRE BLVD. SUITE 200 SUBJECT TO CHANGE AT ANYTIME)N MANAGEMENT AGREEMENT. LOS ANGELES, CA 90036 E) AND DO NOT <br /> a G GROUND REFLECT ACTUAL SITE CONDITIONS. NEITHER <br /> = GC GENERAL CONTRACTOR (323) 303-3839 X2 PHONE PARTY SHALL HAVE ANY OBLIGATION NOR <br /> 9. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING (323}954-8965 FAX <br /> DELIVERY OF MATERIALS FROM STARBUCKS CONTRACTED THIRD LIABILITY TO THE OTHER (EXCEPT STATED <br /> HC HOLLOW CORE PARTY LOGISTICS DISTRIBUTION SERVICES AND VENDOR DIRECT JLAROCCA@VALERIOINC.COM ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY <br /> LO HDW HARDWARE SHIPMENTS. REFER TO CONSTRUCTION MANAGEMENT AGREEMENT EXECUTED BY BOT <br /> C) HM HOLLOW METAL <br /> METHODS AND LEAD TIMES. <br /> H PARTIES, <br /> HORIZ HORIZONTAL FOR <br /> T <br /> HR HOUR 10. RESPONSIBILITY FOR SUPPLY AND DELIVERY OF MATERIALS AND STARBUCKS TEMPLATE VERSION i2017.05.18 <br /> HT HEIGHT <br /> LO HVAC HEATING, VENTILATING, AND AIR EQUIPMENT IS IDENTIFIED IN THE DRAWING SCHEDULE SHEETS <br /> co[V UNDER THE COLUMN LABELED "RESPONSIBILITY <br /> CONDITIONING <br /> SAN JOAQUIN COUNTY <br /> 11. FOR THE PURPOSE OF THE DOCUMENTS: TO"INSTALL", SHALL MEAN m <br /> I.D. INSIDE DIAMETER TO PROVIDE ALL FASTENERS, MISCELLANEOUS HARDWARE, ENVIRONMENTAL HEALTH DEPARTMENT <br /> LEED LEADERSHIP IN ENERGY AND <br /> BLOCKING, ELECTRICAL CONNECTIONS, PLUMBING CONNECTIONS, 1`86$E. HAZELTON-AVE. <br /> AND OTHER ITEMS REQUIRED FOR A COMPLETE AND OPERATION STOCKTON; CA 95205 „ <br /> ENVIRONMENTAL DESIGN 58 8 ill .ire )V #200 T: .; 4 9. � <br /> � LL LANDLORD INSTALLATION, UNLESS OTHERWISE NOTED. <br /> (209)460-1420 <br /> co CI Ap�roVed <br /> Angeles, {sd t4a � x .9 : . 95 <br /> cv 12. ALL ITEM SUBSTITUTIONS MUST BE APPROVED BY THE STARBUCKS ❑Approved;with,chany�es: ee.f�srnafi{s <br /> MAX MAXIMUM DESIGN MANAGER. 13 Disapproved:See Remarks °'A°'+''V,V lCI'brnc.rCa",3M + 'nfo `� 1 riC t�C,.CO <br /> MEP "MECHANICAL, ELECTRICAL, <br /> Q Remarks <br /> AND PLUMBING" 13. REFER TO ITEM CUTSHEFTS FOR ADDITIONAL INFORMATION. ARCHITECT <br /> � MFR MANUFACTURER <br /> U MIN MINIMUM OF RECORD f ~l <br /> NIC NOT IN CONTRACT � to V j <br /> LO Y Cida�i <br /> Approval extends only to that wh h nd described �� j LIC. NO <br /> Date B � a <br /> NL NIGHT LIGHT hereon and does not authorize or appr(jve arty, omission or I *-� C 24228 n <br /> � <br /> NTS NOT TO SCALE <br /> deviation from requirements of state laws or I=tordinances, 1 ExPI R E 5 <br /> OC ON CENTER / <br /> O.D. OUTSIDE DIAMETER <br /> v PLC PLACE <br /> 0 <br /> C <br /> Q <br /> U <br /> Q <br /> U <br /> RESPONSIBILITY LEGEND <br /> I,1J <br /> co <br /> _co N >_ <br /> N <br /> U <br /> 15N <br /> Co <br /> Q, GC GENERAL CONTRACTOR SUPPLIED AND INSTALLED W � Z <br /> LL LANDLORD SUPPLIED W N Z <br /> � SB STARBUCKS SUPPLIED, INSTALLED BY GC ❑ � <br /> DC DISTRIBUTION CENTER z Q <br /> Civ WH STARBUCKS WAREHOUSE (3 PL) W <br /> 05 U <br /> VD STARBUCKS VENDOR DIRECT SUPPLIED, INSTALLED BY GC <br /> >' CW CASEWORK VENDOR SUPPLIED; INSTALLED BY VENDOR/GC < < z <br /> W O � ZU � <br /> VICINITY z o z <br /> U <br /> SYMBOL Q J o <br /> T <br /> C) C) J 0 <br /> O O L U <br /> TCc <br /> N <br /> m NORTH DATUM STORE #: 10997 <br /> rr <br /> ARROW POINT J.. <br /> PROJECT #: 3447$-033 <br /> Q <br /> CASEWORK CONCEPT: <br /> C1) _ i - <br /> o ISSUE DATE: 05/30/18 <br /> DESIGN MANAGER: ONILEE 7ABORNIAK <br /> - - f. EED� AP <br /> m --- <br /> --- L <br /> "`' PROGRAM MANAGER: M. MONTENEGRO <br /> m EXTERIOR INTERIOR SECTION DETAIL <br /> CHECKED BY: VALERIO <br /> ELEVATION ELEVATION CALL-OUT CALL-OUT <br /> CALL-OUT CALL-OUT <br /> Revision Schedule <br /> Rev Date By Description <br /> X'XX" «< .. 05/24/18 BW CHECK SET <br /> C 3, <br /> 05/30/18 BW 1STSUBMITTALSFT <br /> XX XXXX AFF <br /> , 1 <br /> SHEET ABOVE FINISH FINISH REVISION „ <br /> 2 <br /> NOTE FLOOR FACE TO CLOUD 3 <br /> CALLOUT HEIGHT TAG FINISH <br /> E <br /> CD <br /> DISCLAIMER <br /> N FACE r <br /> DIMENSION SHEET TITLE: <br /> C\j ,3: "" GENERAL INFORMATION <br /> co <br /> PXXX E5 XXXXX XXXXX XXXX - THESE DRAWINGSARE BASED ON A COMBINATION OFARCHIVED CAD FILES AND <br /> r PHOTOS PROVIDED BY STARBUCKS COFFEE COMPANY. A SITE SURVEY WAS NOT SCALE: AS SHOWN <br /> C)l PERFORMED BY VALERIO ARCHITECTS FOR THIS PROJECT. EXISTING STRUCTURAL, <br /> REVISION PAINT DESIGN ID DOOR WINDOW MEP CONDITIONS AND ALL DIMENSIONS TO BE FIELD VERIFIED BYTHE GENERAL <br /> SHEET NUMBER: <br /> c� TAG TAG TAG TAG TAG CONTRACTOR PRI <br /> OR TO DEMOLITION 1 FABRICATION I NEW CONSTRUCTION/ <br /> INSTALLATION. <br /> G-0001 <br />