My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIO BLANCO
>
8095
>
2900 - Site Mitigation Program
>
PR0540459
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2020 3:14:18 PM
Creation date
4/9/2020 2:33:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0540459
PE
2960
FACILITY_ID
FA0023127
FACILITY_NAME
PARADISE POINT MARINA
STREET_NUMBER
8095
STREET_NAME
RIO BLANCO
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06605052
CURRENT_STATUS
01
SITE_LOCATION
8095 RIO BLANCO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARADISE POINT MARINA <br /> p, y 8095 RIO BLANCO ROAD,STOCKTON,CALIFORNIA 95209-8760 209/952-1000 <br /> A SEVEN CROWN RESORT <br /> RECEIVEozjl <br /> MAY 2 1 wn <br /> May 17, 1990 ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> Robert Evans; <br /> As of May 16, 1990, we have received our testing equipment so we may comply <br /> with the taking of our daily and weekly testing. <br /> Our B.O.D. and Coliform are still a little high which I am aware of. We <br /> did get them down from the previous month. Plus we found a probale cause in <br /> the higher reading. We had had a break in the backwash line and didn't realize <br /> we had washed out some of the antrosite filter media, which we are now in the <br /> process of purchasing to replace what was lost. I was told that this is one <br /> of the problems with the high B.O.D. The B.O.D. did lower as we started increasing <br /> the batches. <br /> I feel we will conform to all the standards in testing this month. Also <br /> I have worked with F.G.L. , and the amount of time it takes to get our results <br /> back, 30 days this test period, I am now going to try Am Lab in the hope to <br /> reduce the waiting period. <br /> Thank you <br /> Patrick O'Lea <br /> cc: Merwin Rose <br /> Alan Biedermann <br />
The URL can be used to link to this page
Your browser does not support the video tag.