Laserfiche WebLink
• <br /> RECLAMATION DISTRICT NO.2042 <br /> BISHOP TRACT <br /> 311 East Main Street, Suite 504 <br /> Stockton, CA 95202 <br /> (209)943-5551 <br /> TEMPORARY ENTRY PERMIT <br /> RD: RECLAMATION DISTRICT NO. 2042—BISHOP TRACT <br /> PERMITTEE: Peloria Paradise Point LLC <br /> AFFECTED PROPERTY: Levee Station 3+00 to 8+00 In the vicinity of Paradise Point Marina <br /> PROJECT: The Project to which this Temporary Entry Permit applies is described as <br /> follows: <br /> Perform soil and groundwater investigation for fuel pipeline release, <br /> Paradise Point Marina—805 Rio Blanco Road,Stockton,CA. See attached <br /> documents and maps for location and Exhibit(s)for additional details. <br /> AGREEMENT: <br /> Reclamation District No. 2042 — Bishop Tract, herein referred to as RD, does hereby grant to Peloria <br /> Paradise Point LLC,herein referred to as Permittee,permission to encroach upon the area of jurisdiction of <br /> RD as described above,with respect to the above described Project,upon the following terms and conditions, <br /> which by acceptance of this Permit,Permittee agrees to observe and perform: <br /> 1. With the execution of this Permit,the undersigned Permittee acknowledges that the Permittee has read <br /> and agrees to be bound by all of the terms and provisions of this Temporary Entry Permit. The <br /> Permittee shall indicate the acceptance of this Permit, and the terms and conditions hereof, by <br /> executing the form of acceptance on one copy of the Permit and returning it to RD. The Permit shall <br /> not become effective until RD returns one fully executed copy of this Permit to Permittee. <br /> 2. The Permittee shall use reasonable precautions to avoid damage to persons or property. RD assumes <br /> no liability for loss or damage to property or injuries to or deaths of agents,contractors,employees or <br /> representatives of Permittee by reason of the exercise of privileges conferred herein. <br /> 3. RD shall not be liable or responsible for any injury,damage or loss sustained or claimed by the Permittee <br /> or its property or by any employees of the Permittee or their property, or by any third person or his <br /> property,from or as a result of the installation and/or maintenance of the Project while on or about the <br /> said levee, and the Permittee shall indemnify and save RD harmless from any liability therefore, <br /> including the cost of defending any action brought against RD in connection therewith. <br /> 4. Permittee shall acquire no property right in or to the levee or right of way of RD by virtue of this <br /> Permit and RD does not hereby relinquish any right or title therein. <br /> 5. Except as herein otherwise provided,all costs of maintenance,repair and/or replacement of the above <br /> described Project shall be bome by Permittee. Permittee shall,whenever instructed by RD to do so, <br /> 1 of 4 <br />