Laserfiche WebLink
Explanation <br /> OLocation of Suspected Pipeline Release <br /> Well No. 2 Water Supply Well Location <br /> PSBl Soil and Grab Groundwater <br /> Sample Location - Initial Investigation <br /> OSampling Locations with Petroleum Hydrocarbon <br /> Constituents Above Maximum Contaminent <br /> Levels (MCLS) <br /> ® Proposed Supplemental Soil and <br /> Grab Groundwater Sample Locations <br /> ♦ Propose Cone Penetration Test (CPT) Locations <br /> Note: <br /> The locations of the six monitoring wells mentioned in <br /> the work plan addendum are to be determined. Data <br /> gathered from the soil, groundwater, and CPT <br /> investigation will determine monitoring well locations. <br /> There is potential for monitoring well locations to be <br /> selected within the levee template and toe. <br /> N <br /> m <br /> Soil Stockpile Area 0 SCALE IN FEET 40 <br /> Aerial Photo: March 29, 2015 (Google 2015) <br /> Former Waste Water <br /> / Treatment Facility <br /> ® PS1313 PSB1 <br /> a PS63 <br /> 0 <br /> z <br /> 0 <br /> PSB6 <br /> 0 <br /> . /Excavation Perimeter <br /> PS64 ¢ PS62 <br /> PSB5 J <br /> i <br /> PSBSS Fuel <br /> Pipeline <br /> t / 1 P5B32 <br /> L � <br /> ♦ * / PSB7 <br /> Well No. 1 <br /> ® P561 j PSB9 P568 <br /> Approximate <br /> Fuel Line - <br /> Location PS614 <br /> # Weil No. 2 <br /> Proposed Soil, Groundwater CPT Borings <br /> Work Plan Addendum - Entry Permit Application PLATE <br /> PES Environmental , Inc . Paradise Point Marina ^ <br /> Engineering & Environmental Services 8095 N . Rio Blanco Road `J <br /> Stockton, California <br /> 1484.001.01.009 148400101009_EPA_1-2 GMC 3/17 <br /> JOB NUMBER DRAWING NUMBER REVIEWED BY DATE <br />