My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIO BLANCO
>
8095
>
2900 - Site Mitigation Program
>
PR0540459
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2020 2:44:29 PM
Creation date
4/9/2020 2:41:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540459
PE
2960
FACILITY_ID
FA0023127
FACILITY_NAME
PARADISE POINT MARINA
STREET_NUMBER
8095
STREET_NAME
RIO BLANCO
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06605052
CURRENT_STATUS
01
SITE_LOCATION
8095 RIO BLANCO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PES Environmental, Inc. <br /> vEngineering 8 Environmental Services <br /> November 4, 2016 <br /> 1484.001.01.002 <br /> California Environmental Protection Agency <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive #200 <br /> Rancho Cordova, California 95670 <br /> Attention: Ms. Emily Cushman <br /> Subject: Addendum <br /> Work Plan for Soil and Groundwater Investigation <br /> Fuel Pipeline Release <br /> Paradise Point Marina <br /> 8095 Rio Blanco Road, Stockton, California <br /> Dear Ms. Cushman: <br /> On behalf of Peloria Paradise Point LLC (Peloria), PES Environmental, Inc. (PES) has <br /> prepared this addendum to the November 24, 2015 work plan to investigate the extent of <br /> petroleum hydrocarbon-affected soil and shallow groundwater resulting from a subsurface fuel <br /> pipeline release at Paradise Point Marina in Stockton, California (the site or subject property, <br /> see Plate 1). Per your request in a June 29, 2016 email, this investigation work plan <br /> addendum has been prepared showing the locations of proposed soil and groundwater borings <br /> with sampling depths and well construction parameters for future monitoring wells. A plume <br /> map using data from the initial investigation has also been prepared per your request. Per your <br /> October 18, 2016 email, this work plan addendum also includes quarterly monitoring <br /> procedures for the two water supply wells located in close proximity to the fuel release. <br /> SCOPE OF WORK <br /> Soil and Grab Groundwater Sampling and Analysis <br /> As part of this supplemental investigation, soil and grab groundwater samples will be collected <br /> from up to 14 locations (see Plate 2). Sample collection and testing protocols will follow <br /> procedures detailed in the original work plan. <br /> 7665 Redwood Boulevard • Suite 200 • Novato, California 94945 • Tel (415) 899-1600 • Fax(415)899-1601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.