Laserfiche WebLink
EXXON #7-3942 Page 1 of 1 <br /> Path to Closure Plan 9kQM60EtU1=I MANAGE PROO&M I REPORTS I SEARCH I LQ91= <br /> EXXON#7-3942(7060770007 9)-MAP THIS SITE <br /> OPEN-REMEDIATION <br /> 4444 PERSHING AVE N cIFANUP OVEaSIGHT AGENCIES <br /> ACTIVITIES REPORT SANJOAOUINCOUNTY LQF I..)-CASE a113/ <br /> STOCKTON,CA 95207 LASEHORKER:VQUMC RTNEY-SUPERVISMADRIENNEELLSAESSER <br /> SAN JOAQUN COUNTY PUBLIC WEEPAGE CE GSEIWRNER:JAMESIREGION SS)-CASE Ill,BARTON SUPERVTSOR:CCORI CONDON <br /> VIENPR N•A ILE 'SE SUI VIM Y FOR THIS SITE <br /> LIIF CI•im f.531] CUF PAadry As•ipmd:0 LUF Amount Paid:In 410000 <br /> THIS PROJECT WAS LAST MODIFIED W Bain vcunrw%WON 11MIM13131:M PM-j115TORY <br /> THIS SITE MS SUBMITTALS.CICHjjjj6ET0 OPEN A NEW VANDOW VAIN THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Pethto Closure Plan-FY 12M3 THIS VERSKIN IS FINAL AS OF 11alaO13 PATH To CLOSURE HBTORY e E <br /> IMPEDIMENT 1: <br /> General Criteria F:Secondary source has NOT been removed to the extent practicable ❑ Procedural Impediment-jin <br /> Step to Resolve Impetliment 1-Sip is- COMPLETION DATE <br /> Implement the ERO-approvetl WP for an ISCO beet. Oxidant injection is Pending. <br /> PROJECTED DATE A Ing DA <br /> 313112014 _ <br /> Step to Resolve Imps®meet 1-step 2:- COMPLETION DATE <br /> ConGuc[ follow-up confimation groundwater monitoring and submit report of findings. <br /> pCNAL DATE <br /> M14 <br /> Sts,to Revolve Impediment 1-Step 3:-DE COMPLETION DATE <br /> Former waste ail UST lection :ay require further evaluation before site closure consideration by Me <br /> F— <br /> [ <br /> ATE ACTUAL DATE <br /> vRWQCB. <br /> 3�31rzou � J <br /> ADDADDITIONALSTEP <br /> IMPEDIMENT 2: <br /> M d' -Soect6c C tend:Groundwater:The contaminant plume that exceeds water quality objectives Is fl Procedural Impediment-lin <br /> NOT Stable or decreasing in areal extent,and does NOT meet all of the additional characteristics of one of <br /> the Nve classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length(That Exceeds Water Quality Objectives):>_260 Feet and<1,000 Feet <br /> • Benzene Concentration:2 3,000 pgll <br /> Sts,to Revolve Impel im•id 2-Step 1:- COMPLETION DATE <br /> Reduce benzene concentration through the ISCO test and implementation if appropriate. <br /> PROJECTED DATE ACTUAL GATE <br /> &3012014 r <br /> ADD ADDITIONAL STEP <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> PUBLIC WEBS <br /> DATE IDENTIFIED RP NOTIFICATION PARTICIPATION DESTRUCTION WASTE DISPOSAL LANE SITE CLOSURE <br /> FOR CI F I DATE COMPLETIONO OPTE RESTRICTION DnTE <br /> •DrN Identified for CIQsum is the daft all impediments to closure have been removed Ir-� <br /> Save In Progress Save as Final <br /> LOGGED IN AS HENDERSONN CONTACT GEOTRpOKER HELP <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=T... 11/21/2013 <br />