Laserfiche WebLink
TABLE 1 WELL CONSTRUCTION DETAILS,FORMER EXXON RS 73942,4444 NORTH PERS 4444 NORTH PERSHING AVENUE,STOCKTON,CALIFORNIA <br /> Well Elevation <br /> Borehole Casir TABLE 1 WELL CONSTRUCTION DETAILS FORMER EXXON RS 73942, <br /> Well Installation TOC Casing Total Depth Well Depth Diameter Diame <br /> Well Elevation Borehole Casing Screened Filter Pack <br /> Number Date (feet) Material feet (fee[ (inches) (inche Well Installation TOC Casing Total Depth Well Depth Diameter Diameter Interval Slot Size Interval Filter Pack <br /> Number Date (feet) Material (feet) (feet) inches inches (feet) inches (feet) Material <br /> 1 10.25 4 27-47 25-49 Sand <br /> PSV1 01/16/91 -- PVC 35 17 8 IW1 a 01/15/91 6.87 PVC 49 47 <br /> PVC 35 34.5 8 1 <br /> '- PVC 10 4 11-30 0.020 9-31.5 Sand <br /> 35 17 8 1 MW I a 01/27/87 6.38 PVC 31.5 31 <br /> P8y2 01/16/91 -- 1p 4 10-30 0.020 8-31.5 Sand <br /> -- PVC 35 34.5 s I MW2 a 01/27/87 7.15 PVC 31.5 30 <br /> 49 10.25 4 10 4 10-30 0.020 8-30.5 Sand r <br /> RW1 a 05/09/90 7.68 PVC 50 MW3 a 01/27/87 8.51 PVC 30.5 30 <br /> 49 10.25 4 to 4 10-30 0.020 8-30 Sand <br /> RW2 a 05/09/90 6.76 PVC 50 ),,1t�yq a 01/27/87 7.12 PVC 30 30 <br /> RW3 Destroyed;replaced by the UVB well- <br /> 6 4 10-30 0.020 8.5-30 Sand <br /> MWS a 07/14/87 8.58 PVC 30 30 <br /> RW4 a 01/18/91 7.86 PVC 45 45 10.25 46 4 10-30 0.020 8.5-30 Sand <br /> MW6 a 07/14/87 7.44 PVC 30 30 <br /> 45 10.75 2 6 4 10-32 0.020 8.5-32 Sand <br /> SWl a 05/12/93 8.25 PVC 46 A,1W7 a 07/14/87 6.80 PVC 32 32 <br /> 3W2 a 05/12/93 7.53 PVC 51 50 10.75 2 MW8 a 02/23/88 6.42 PVC 34 30 <br /> 11 4 11-30 0.020 8-34 Sand <br /> C1VB + 11/01/96 -- Steel 43 42 24 16 MW9 a 02/24/88 6.52 PVC 35 29.5 11 4 9.5-29.5 0.020 7.5-35 Sand <br /> WB-MWl a 02/11/97 7.40 PVC 40 40 8 2 MW10 a 04/08/88 7.25 PVC 38 35 <br /> 11 4 10-35 0.020 8-38 Sand <br /> UVB-MW2 a 8 2 MW1l ad 04/17/91 5.84 PVC 44 43.5 10 4 22.5-43.5 0.020 21-44 Sand- <br /> 02/11/97 7.74 PVC 32 32 { <br /> 40 10 4 MW12 a 01/21/91 7.75 PVC 39 39 <br /> 10 4 24-39 0.020 28-39 Sand <br /> VI a 02/19/91 7.58 PVC 40 <br /> 10.75 4 24.5-44.5 0.010 23-45 Sand <br /> V2 a 02/18/91 8.11 PVC 40 <br /> 40 8 2 MWl3 a 05/11/93 8.08 PVC 45 44.5 <br /> MWl4 e 07/27/09 7.57 PVC/S 99 97 15(0-50') 8.625 f <br /> V3 a 02/18/91 7.61 PVC 40 40 8 2 8(50-99') 2 82-97 0.010 80-99 #2/12 Sand <br /> V4 a 02/18/91 8.12 PVC 40 40 8 2 <br /> IP1A c 09/21/04 7.93 SS 41 33.5 8.25 0.50 <br /> PI a 01/14/91 6.44 PVC 43.5 43 8 2 28-43 -- 26-43 Sand <br /> 6 2 29-44 27-44.5 Sand <br /> P2 a 01/14/91 6.77 PVC 44.5 44 <br /> - <br /> a:\projeda\73942\pub1ic\we11 cwstmcti0n\3942we11det"s X'S Page I of4 <br /> g\proje<u\73942\paNic\cel1 consVuaionl3942we11detv1s.t1s <br />