Laserfiche WebLink
g <br /> NOS <br /> N!" B 1990 <br /> WORK TO BE COMPLETED NEXT QUARTER: /$E A✓ICES j T� <br /> Continue quartertly groundwater monitoring and analysis. Install two groundwater monitoring <br /> wells off the site and downgradient of MW 10-one well still requires an easement from Crestwood <br /> Hospital. <br /> Permit soil vapor and groundwater extraction and treatment systems. <br /> WELL GAUGING AND MONITORING SUMMARY: <br /> Elevation Depth Elevation Approx <br /> Top of to of Product Groundwater <br /> Well Casing Water Groundwater Thickness Flow <br /> No Date (ft msl) (ft) (ft msl) (ft) Direction <br /> MWl 0627/90 6.49 28.70 -22.21 <br /> MW2 0627/90 6.11 Dry <br /> MW3 0627/90 5.78 28.63 -23.78 0.12 <br /> MW4 0627/90 6.74 29.32 -22.58 <br /> MW5 0627/90 5.32 Dry <br /> MW6 0627/90 6.02 Dry <br /> MW7 0627/90 7.04 Dry <br /> MW8 0627/90 6.98 28.33 -20.55 <br /> MW9 0627/90 6.94 28.67 -21.73 <br /> MW10 0627/90 6.25 32.52 -26.27 <br /> RWl 0627/90 9.16 31.14 -21.98 <br /> RW2 0627/90 9.70 29.73 -20.03 <br /> RW3 0627/90 9.30 31.39 -22.09 <br /> MWI 05/18/90 6.49 28.24 -21.75 <br /> MW2 05/18/90 6.11 Dry <br /> MW3 05/18/90 5.78 28.63 -23.78 0.12 <br /> MW4 05/18/90 6.74 28.87 -22.13 <br /> MW5 05/18/90 5.32 Dry <br /> MW6 05/18/90 6.02 Dry <br /> MW7 05/18/90 7.04 Dry <br /> MW8 05/18/90 6.98 27.87 -20.89 <br /> MW9 05/18/90 6.94 28.23 -21.29 <br /> RW 1 05/18/90 30.74 <br /> RW2 05/81/90 29.20 <br /> RW3 05/18/90 30.95 <br /> MW1 0321/90 6.49 27.46 -19.70 <br /> MW2 0321/90 6.11 Dry <br /> MW3 0321/90 5.78 28.51 to product 0.11 <br /> MW4 0321/90 6.74 28.06 -19.93 <br /> MW5 0321/90 5.32 Dry <br /> MW6 0321/90 6.02 Dry <br />