My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 9:19:48 AM
Creation date
4/10/2020 8:44:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . Name and address of site, tank owner, and contact person ( if <br /> different ) . <br /> Former <br /> Tank Owner: EXXON Company, U.S.A. <br /> 1200 Smith Street, Suite 1050 <br /> Houston, Texas 77002 <br /> ( 713 ) 656-7758 <br /> Contact: James Kerr, P.G. <br /> Site Owner : Bank of Stockton <br /> 347 N. Sutter <br /> P.O. Box 1110 <br /> Stockton, California 95201 <br /> ( 209 ) 941 -1505 <br /> Contact: George Shettko <br /> 2 . Map showing site location relative to nearby landmarks ( north <br /> is up ) see Figure 2-1 . <br /> 3 . Sketch of the site showing nearby streets and properties, see <br /> Figure 3-1 . <br /> 4 . Layout of all tanks and piping systems labeled for content <br /> see Figure 4-1 . <br /> 5 . Results of tank tests or initial site work. <br /> To date the following initial site work has been conducted: <br /> A. Removal of tanks and associated piping coupled with <br /> collection of soil samples for chemical analysis ( see <br /> Appendix A) . <br /> B. Installation and sampling of monitoring wells ( see <br /> Appendix B ) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.